background image

     10

NOTE: The M8 Bolt Cover (LL), M6 Bolt Cover (MM), M8 PLASTIC Cap (NN),

M6 PLASTIC Cap (OO) in step 1 to 8 are only for reference. Please attach

them to bolts in step 9.

Vendor stock No.: GCS00283D

TUSCANY 2PERSON  PATIO SWING

Step 9: 

- Attach the assembled canopy on both sides to the Top Bar (A).

- Insert the Knob (N), turning the Knob (N) clockwise tightly.

- Ensure all connections are secure before use.

- Attach the M8 Bolt Cover (LL), M6 Bolt Cover (MM), M8 Plastic Cap (NN) and

  M6 Plastic Cap (OO) to all the bolts as shown in previous steps.

Содержание GCS00283D

Страница 1: ...8269 1791 17 6 79 64965 9 12 6 9 64 A BBBC D E F G H E H I F C J E K BBBC D E F G H E H I F C J E K BBBC D E F G H E H I F C J E K BBBC D E F G H E H I F C J E K 1 1 664 A L M N O O M P Q R M S L Q T...

Страница 2: ...8 6 4 8 42 5 0 012 3 44 3 5 0 5 61 70 3 01 2 880 3 9 5 03 44 653 3 3 4 1 A B C D E B E F C G B H A B C D E B E F C G B H A B C D E B E F C G B H A B C D E B E F C G B H 0 4 I 3 0 J K L M M K N O P K Q...

Страница 3: ...1...

Страница 4: ...2...

Страница 5: ...E The M8 Bolt Cover LL M6 Bolt Cover MM M8 PLASTIC Cap NN M6 PLASTIC Cap OO in step 1 to 8 are only for reference Please attach them to bolts in step 9 Vendor stock No GCS00283D TUSCANY 2PERSON PATIO...

Страница 6: ...t 2 JJ M8 Washer 18 KK M6 Washer 18 LL M8 Bolt Cover 6 MM M6 Bolt Cover 2 NN M8 Plastic Cap 12 OO M6 Plastic Cap 16 PP Hook 2 QQ Allen Wrench 1 RR Wrench 1 NOTE The M8 Bolt Cover LL M6 Bolt Cover MM M...

Страница 7: ...e attach them to bolts in step 9 PART NO PICTURE DESCPRITION QTY A Top Bar 1 B Leg 4 C Short Connector 2 D Leg Connector 2 E Seat 1 F Back 1 G Right Arm 1 H Left Arm 1 I 2 J 2 K Top Straight Bar 1 L T...

Страница 8: ...Bar A to the Leg B Connect with M8 x 105 Bolt AA the M8 Washer JJ and the M8 Nut HH as shown in the picture Loosely tighten by hand Step 2 Attach the Short Connector C to the Top Bar A Connect with M8...

Страница 9: ...00283D TUSCANY 2PERSON PATIO SWING Step 3 Attach the Leg Connector D to the Leg B Connect with M6 x 40 Bolt EE the M6 Washer KK as shown in the picture Tighten all the bolts from step 1 to step 3 with...

Страница 10: ...Right Arm G and Left Arm H With M6 x 20 Bolt GG and M6 Washer KK as shown in the picture Bring the holes in the free ends of Short Hanging Bar I Long Hanging Bar J together and thread them onto the Ho...

Страница 11: ...IO SWING Step 7 Hang the Hook PP in the holes on the Short Connector C Step 8 Attach the Top Straight Bar K to the Top Curved Bars L with M6 x 30 Bolt FF and M6 Washer KK and the M6 Nut II as shown in...

Страница 12: ...ep 9 Vendor stock No GCS00283D TUSCANY 2PERSON PATIO SWING Step 9 Attach the assembled canopy on both sides to the Top Bar A Insert the Knob N turning the Knob N clockwise tightly Ensure all connectio...

Отзывы: