![York YVAM Скачать руководство пользователя страница 5](http://html1.mh-extra.com/html/york/yvam/yvam_start-up-checklist_912789005.webp)
10. Evaporator
Refrigerant
Smart Freeze
11. Condenser
High Pressure Warning Threshold
12. Condenser
>
Refrigerant Level Control
Sub Cooling Setpoint
Start Up Position
Start Up Delay
Ramp Time
13. Compressor
>
Surge Protection
Shutdown enabled
Count Window
Count Limit
Surge Sensitivity
14. Compressor
>
VGD Actuator
VGD Stroke Calibration Complete LED lit
VGD Feedback Calibrated LED lit
I. Chiller operation
1. Evaluate the evaporator water flow
indication compared to the design
information found on the sales order. If
shell pressure drop is used, it must be
within ±15% of the rating information.
2. After the chiller is at full load at design
Leaving Chilled Liquid Temperature,
capture the Operating Data to print or save
to a text file.
Forms 160.88-OM1
or
160.88-
M2
explain how to capture data from the
panel.
J. Chiller setpoints print
1. Capture the chiller Setpoints to print or to a
text file from the Setpoints-Print command.
Model YVAM Start-up Checklist
5