SECTION 7 – MAINTENANCE
START THE CHILLER-HEATER AFTER IT HAS
BEEN STOPPED FOR A LONG PERIOD
When you start the chiller-heater after it has not run for
a long time, use the following procedure.
1. Check the insulation of the Control Center and
the electric system.
2. Check the operation of the Control Center and the
safety devices.
3. Check that the refrigerant blow valve V2 is closed.
4. Check the vacuum level in the machine. Use the
pressure gauge of the high temperature generator.
It should be less than -0.1 MPaG.
5. Check the waste exhaust gas supply.
6. Check the waste hot water supply.
7. Press the Refrigerant Pump
Stop
button.
If the checks show no problems, start the chiller-heater.
Checks After Operation Starts
1. 10-15 minutes after the chiller-heater and the so-
lution pump start, check the level gauge of the re-
frigerant tank.
2. If the refrigerant level is within the level gauge,
press the Refrigerant Pump
Auto
button.
3. Observe the operation for a while. Check that the
refrigerant liquid level does not drop.
4. Use the procedure shown in
to purge non-condensable gas directly
from the absorber.
PURGE PROCEDURE
Non-condensable gas must be purged from the chiller-
heater to maintain its performance and prevent dete-
rioration of its internal parts. This chiller-heater has an
automatic purge system.
Even if the automatic purge mode is used during nor-
mal operation, perform the manual operation for the
purging tank and absorber periodically. For the purging
period, see
Содержание YHAU-CE-JE Series
Страница 10: ...JOHNSON CONTROLS 10 FORM 155 33 ICOM2 EN GB ISSUE DATE 12 4 2017 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 14: ...JOHNSON CONTROLS 14 FORM 155 33 ICOM2 EN GB ISSUE DATE 12 4 2017 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 22: ...JOHNSON CONTROLS 22 FORM 155 33 ICOM2 EN GB ISSUE DATE 12 4 2017 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 120: ...JOHNSON CONTROLS 120 FORM 155 33 ICOM2 EN GB ISSUE DATE 12 4 2017 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 135: ...JOHNSON CONTROLS 135 FORM 155 33 ICOM2 EN GB ISSUE DATE 12 4 2017 9 THIS PAGE INTENTIONALLY LEFT BLANK...