![background image](http://html1.mh-extra.com/html/york/r-410a/r-410a_technical-and-service-manual_3503981273.webp)
Installation
___________________________________________________________________________________
___________________________________________________________________________________
- 272 -
For construction convenience, before laying pipes, use insulation material to insulate the
pipes to be deal with, at the same time, at two tips of the pipe, remains some length not to be
insulated, in order to be welded and check the leakage after laying the pipes.
6.2.3 Insulate for the jointing area, expanding area and the flange area
6.2.3.1 Insulate for the jointing area, expanding area and the flange area should be done after
checking leakage of the pipes
6.2.3.2 Make sure there’s no clearance in the joining part of the accessorial insulation material
and local preparative insulation material.
6.2.4 Enswathe disposal
After insulation of the pipes, do the enswathe disposal with binding belt, make sure it’s tight.
Содержание R-410A
Страница 103: ...Wall mount 102 Part 4 2 Wall Mounted...
Страница 113: ...Wall mount 112 4 Dimensions 4 1 YDS 22 36EC 4 2 YDS 45 56EC...
Страница 115: ...Wall mount 114 5 Piping Diagrams 5 1 YDS 22 56EC 5 2 YDS 22 56HC...
Страница 116: ...Wall mount 115 6 Wiring diagrams 6 1 YDS 22 36EC 6 2 YDS 45 56EC...
Страница 117: ...Wall mount 116 6 3 YDS 22 56HC...
Страница 118: ...Wall mount 117 7 Sound level 7 1 Test condition 7 2 Noise spectrums YDS 22 36EC HC...
Страница 119: ...Wall mount 118 YDS 45 56EC HC...
Страница 120: ...Wall mount 119 8 Velocity temperature distribution Discharge angle 70...
Страница 289: ...Controller ___________________________________________________________________________________ 288 Part 6 Control System...