background image

If lock-out continues to occur, locate the source of the
problem and correct.

b. Check all 24 volt connections from the relay board to

and in the gas heat section. Check low voltage connec-
tions to the (TDR) located in the control box.

c. If the furnace is hot, it may be out on an over-tempera-

ture condition, wait for limit reset.

d. If the furnace is cold, check for 24 volts at wire 241

attached to the time delay relay (TDR) located in the
main control box. If 24 volts is not found, replace the
TDR relay.

e. If 24 volts is found at wire 241, remove the wires

attached to the (TDR) and with a VOM, check for
continuity across contacts 1 and 2. If none is found, the
(TDR) is open and must be replaced. If there is conti-
nuity, re-attach the wires.

With the draft motor running, check for 24 volts at
terminal 4 of (RW1-2) and (RW2-1). If 24 volts is not
present, the centrifugal switch (CS) has not closed or
has gone bad. Check the line voltage to the unit -  if it
is correct, replace the draft motor. If line voltage is low,
call the power company.

f.

Check for 24V at terminal 2 of (RW1-2 and RW2-1). If
24V is not present, check for 24V at (RW1 and RW2)
relay coils. If these relays are pulled in, then check for
a loose connection at terminal 2 and terminal 4 of each
relay. If no problem is found, then replace (RW1 and/or
RW2) as required.

g. If 24 volts is present at the ignitor controls, check all

control wiring at the ignitor controls and the high tension
wire to the ignitors. Check that the ground wires from
the ignitor controls, the gas valves and pilot burners are
all intact and making good electrical connection. Check
to make sure that the ceramic insulator on the pilot
ignitors or sensors is not broken or cracked, if all are
intact, replace the ignition control IC1 or IC2.

5. The draft motor runs and the sparker sparks at the pilot

burner but the pilot does not ignite and a gas odor is not
detected at the draft motor outlet.

a. Check to make sure gas is being supplied to the unit.

Make sure that the gas pressure to the unit is within the
proper limits as described in the “POST START CHECK
LIST” and that the pilot adjust screw is allowing some
flow of gas as described in “PILOT CHECKOUT”.

b. Check all wiring between the ignitor control and the gas

valve. Check to make sure the ground connections are
intact.

c. If the wiring is intact, check for 24 volts across terminals

“PV” and “COMMON” on the ignitor control. If 24 volts
is not present, replace the ignitor control.

d. If 24 volts is present, remove the pilot burner and

remove the pilot orifice from the pilot burner. The orifice
is removed in the direction opposite the flow of gas.
Inspect the orifice for obstruction. If it is clear, replace
the main gas valve.

6. The sparker sparks at the pilot burner but the pilot does not

ignite and a gas odor is detected at the draft motor outlet.

a. Adjust the pilot adjust screw on the gas valve as de-

scribed in “PILOT CHECKOUT”.

b. Check the supply pressure as described in “POST

START CHECK LIST”. Make adjustments as necessary.

c. Check the pilot orifice for obstruction as described in

para. 5d. Clean as needed but the problem should not
be the gas valve.

7. The pilot burner ignites but the sparker continues to spark

and the main burners do not ignite.

a. Make the same checks and adjustment as described in

para. 6.

b. Make sure that the pilot burner is not bent or damaged.

c. Make sure that the ground connections at the pilot

burner, gas valve and ignitor control are intact. Check
the high tension wire for good electrical connection. If
all are intact, replace the ignitor module.

8. The pilot burner lights and the spark stops but the main

burners do not light.

a. Check electrical connections between the ignitor con-

trol and the gas valve. If intact, check for 24 volts across
terminals “MV” and “COMMON” terminals. If no voltage
detected, replace ignitor control. If voltage is present,
replace gas valve.

9. Furnace lights with roll-out or one burner has delayed

ignition.

a. Make sure that the pilot burner is aligned properly with

the carryover as described in “PILOT CHECKOUT”.

b. Make sure that the carryovers on adjoining burners are

screwed fast and are level with respect to one another.

10. Main burners light but exhibit erratic flame characteristics.

a. Adjust air shutters as described in “BURNER AIR

SHUTTER  ADJUSTMENT”.

b. Check the main burner orifices for obstruction and

alignmen t. Re moval  procedure  is  de scribed  in
“BURNER INSTRUCTIONS”. Clean or replace burner
orifices and burners as needed.

TROUBLESHOOTING

 - Cont’d.

530.18-N11Y

22

Unitary Products Group

Содержание D1CE

Страница 1: ...6 1V Propane Conversion Accessory 530 18 N6 2V High Altitude Accessory Nat Gas 530 18 N6 3V High Altitude Accessory Propane Renewal Parts Refer to the Renewal Parts Manual for complete listing of repl...

Страница 2: ...trical Data Basic Units 10 6 Electrical Data Units With Elec Heat 10 7 Supply Air Blower Performance 13 8 Static Resistances 14 9 Power Exhaust Performance 14 10 Blower Motor and Drive Data 14 11 Heat...

Страница 3: ...talled on a solid level roof curb or appropriate angle iron frame CAUTION If a unit is to be installed on a roof curb or special frame other than a YORK roof curb gasketing must be applied to all surf...

Страница 4: ...uctwork to accommodate the damper Using the holes in the hood flanges as a template drill 9 64 dia 26 drill holes into the ductwork and secure with the screws provided CAUTION If outdoor air intake wi...

Страница 5: ...FIG 5 TYPICAL FIELD WIRING Wire Size 1 AWG Gauge 22 20 19 18 16 40 120 150 190 305 Maximum Wire Length2 Feet Notes 1 Solid Class II copper wire CONTROL WIRE SIZES 530 18 N11Y Unitary Products Group 5...

Страница 6: ...ons and to Table 6 for electrical data COMBUSTION DISCHARGE DCG Models The products of combustion are discharged horizontally through two screened hooded openings on the upper gas heat access panel GA...

Страница 7: ...ediately upstream of the gas supply connection to the furnace L P UNITS TANKS AND PIPING DCG Models All gas heat units are shipped from the factory equipped for natural gas use only The unit may be co...

Страница 8: ...but do not remove the two panel latches CAUTION Extreme care must be exercised in turning both the setpoint and minimum position adjusting screws to prevent twisting them off 1 The enthalpy set point...

Страница 9: ...FIG 9 ENTHALPY SETPOINT ADJUSTMENT 530 18 N11Y Unitary Products Group 9...

Страница 10: ...breaker 2 Although these sizes are based on 75 C copper conductors aluminum wire can be used Refer to the National Electric Code in U S A or the current Canadian Electrical Code in Canada to determine...

Страница 11: ...be provided between any combustible material and the supply air ductwork for a distance of 3 feet from the unit The products of combustion must not be allowed to accumulate within a confined space an...

Страница 12: ...sheet metal covers except when the unit includes a power exhaust option The covering consists of a heavy black paper composition 3 Replace the side supply and return air compartment panels For side du...

Страница 13: ...12 2 2 0 16 6 13 9 HIGH SPEED DRIVE ACCESSORY 1118 6 0 2 3 8 8 7 4 1 8 10 3 8 6 1 3 11 9 10 0 0 7 13 6 11 4 0 2 15 4 12 9 1170 5 0 2 7 9 4 7 9 2 2 11 0 9 2 1 7 12 7 10 6 1 1 14 5 12 2 0 5 16 4 13 7 12...

Страница 14: ...pulley below 1 turn open MOTOR SPEED STATIC RESISTANCE OF RETURN DUCTWORK IWG 0 2 0 3 0 4 0 5 0 6 CFM KW CFM KW CFM KW CFM KW CFM KW HIGH 5250 0 83 4500 0 85 4200 0 88 3750 0 93 3000 0 99 MEDIUM 4900...

Страница 15: ...operate if the fan switch on the room thermostat is set in the ON position ECONOMIZER WITH DUAL ENTHALPY SENSORS The operation with the dual enthalpy sensors is identical to the single sensor except t...

Страница 16: ...and the main gas valve opened Gas flows into each of the second stage main burners and is ignited from the carryover tube flame If IC2 fails to detect a pilot flame it will continue to try for a maxi...

Страница 17: ...e these limits contact the local gas utility for corrective action MANIFOLD GAS PRESSURE ADJUSTMENT Small adjustments to the high fire gas flow may be made by turning the pressure regulator adjusting...

Страница 18: ...resistances of both the supply and the return air duct systems With this information the RPM for the supply air blower and themotor pulley adjustment turns open can bedeterminedfrom the blower perform...

Страница 19: ...and drive data CHECKING GAS INPUT NATURAL GAS 1 Turn off all other gas appliances connected to the gas meter 2 With the furnace turned on measure the time needed for one revolution of the hand on the...

Страница 20: ...tructed by overhanging structures of shrubs GAS HEATING UNITS BURNER PILOT Periodically at least annually at the beginning of each heating season make a visual check of the pilot and main burner flame...

Страница 21: ...go to Step f If it does not check to see if line voltage is being supplied to the contacts of the contactor 3M and if the contactor is pulled in Check for loose wiring b If contactor 3M is pulled in p...

Страница 22: ...ILOT CHECKOUT b Check all wiring between the ignitor control and the gas valve Check to make sure the ground connections are intact c If the wiring is intact check for 24 volts across terminals PV and...

Страница 23: ...530 18 N11Y Unitary Products Group 23...

Страница 24: ...ary Products Group P O Box 1592 York Pennsylvania USA 17405 1592 Subject to change without notice Printed in U S A Copyright by York International Corporation 1995 All Rights Reserved Code SBY 530 18...

Отзывы: