5169032-UIM-C-0416
Johnson Controls Unitary Products
19
SECTION XV: INSTALLATION
VERIFICATION
Prior to and during the accomplishment of the installation procedures,
verify all tasks are accomplished as indicated in this installation manual.
FIGURE 18:
Duct Static Measurements
T
a
k
e
measurements
h
ere
if
using
a
fil
ter
ra
ck.
R
eturn
air
stati
c
must
b
e
ta
k
en
b
et
w
een
t
h
e
fil
ter
and
ind
oo
r
co
i
l.
A
0
3
9
5-
001
FIGURE 19:
Drain Traps
THERMAL EXPANSION VALVE (TXV) CHECK LIST
I
s
co
i
l
metering
de
v
i
c
e
insta
ll
ed
co
rre
c
t
l
y
?
W
as
t
h
e
co
rre
c
t
TXV
insta
ll
ed
p
er
t
h
e
o
utd
oo
r
unit
T
e
ch
ni
c
a
l G
uide
?
I
s
t
h
e
TXV b
u
lb po
siti
o
ned
co
rre
c
t
l
y
?
I
s
tem
p
erature
b
u
lb
insu
l
ated
?
I
s
e
q
ua
l
i
z
er
l
ine
co
nne
c
ted
?
3”
M
INI
M
U
M
HAND
M
ADE TRAP
PRE
M
ADE TRAP
S
S
E
CO
NDARY
PRI
M
ARY
WERE THE PRI
M
ARY AND
S
E
CO
NDARY DRAIN
S
TRAPPED
CO
RRE
C
TLY?
A
0
272-
001
PLUG
(UNU
S
ED
S
E
CO
NDARY
DRAIN)
FIGURE 20: Location of Coil Trapped and Plugged Drain Connections
NOTE:
V
erify
t
h
at
a
ll
drains
are
tra
pp
ed
o
r
pl
ugged
.
AIR HANDLER
CO
IL
B
LEFT FL
O
W
APPLI
C
ATI
O
N
A
0
335-
001
DETAIL A
PRI
M
ARY DRAIN
TRAP
CO
NNE
C
TI
O
N
S
E
CO
NDARY DRAIN
TRAP
CO
NNE
C
TI
O
N
DRAIN PLUG
F
O
R H
O
RIZ
O
NTAL
S
E
CO
NDARY DRAIN
DETAIL B
PRI
M
ARY DRAIN
TRAP
CO
NNE
C
TI
O
N
DRAIN PLUG
F
O
R VERTI
C
AL
S
E
CO
NDARY DRAIN
A
CO
IL
AIR HANDLER
UPFL
O
W
APPLI
C
ATI
O
N
AIR HANDLER
D
O
WNFL
O
W
APPLI
C
ATI
O
N
CO
IL
A
B
AIR HANDLER
CO
IL
RIGHT FL
O
W
APPLI
C
ATI
O
N