![YOKOGAWA Vigilantplant NFBU200-S Series Скачать руководство пользователя страница 13](http://html1.mh-extra.com/html/yokogawa/vigilantplant-nfbu200-s-series/vigilantplant-nfbu200-s-series_user-manual_3497874013.webp)
<4. Engineering>
4-1
IM 11B06F01-01E
4. Engineering
ASIU requires the engineering at installation, and modification.
The install procedure of FCN is referred to “STARDOM FCN/FCJ Software Installation” (IM
34P02Q91-01E), and “STARDOM FCN/FCJ Guide” (IM 34P02Q01-01E).
4.1 Installation
This section explains the setup of FCN, license registration, loading of the application software,
initializing of IP address and assignment of I/O cards.
4.1.1 Preparation
l
Installation of the engineering tool
Install the resource configurator software from CD-ROM (NT203AJ-PC11E) to PC.
Resource configurator software is an engineering tool for STARDOM FCN/FCJ.
l
Installation of the ASIU software
Set the ASIU application software CD on PC.
Uncompress the following compressed file on PC.
(CD Drive)/ASIU/INSTALL_ASIU.ZIP
Confirm the following folder is created.
[Uncompressed folder]/INSTALL_ASIU
4.1.2
Initial setting
l
Loading the license file
Download the FCN license file from the STARDOM license publishing web site.
Refer to D1. License in “STARDOM FCN/FCJ Guide (IM 34P02Q01-01E) about the license.
4th Edition : Nov. 22, 2011-00