![YOKOGAWA DPharp EJA115E Скачать руководство пользователя страница 3](http://html1.mh-extra.com/html/yokogawa/dpharp-eja115e/dpharp-eja115e_user-manual_911694003.webp)
ii
IM 01C25K01-01E
Process Piping Installation Precautions ........................................................5-1
Connecting Process Piping to the Transmitter ..................................5-1
Routing the Process Piping ...............................................................5-1
Process Piping Connection Examples ...........................................................5-2
Connections of External Wiring to Terminal Box ..........................................6-1
Power Supply Wiring Connection ......................................................6-2
External Indicator Connection............................................................6-2
Communicator Connection ................................................................6-2
Check Meter Connection ...................................................................6-2
Status Output Connection ..................................................................6-3
............................................................................6-3
Power Supply Voltage and Load Resistance .................................................6-5
Transmitter Measurement Range (Determining Differential Pressure Range)
Determining the Differential Pressure Range ....................................7-3
Example of Calculation ......................................................................7-4
Venting or Draining Transmitter Pressure-detector Section .......................7-6
Draining Condensate .........................................................................7-6
Local Parameter Setting (LPS) Overview ..........................................7-7
Activating Local Parameter Setting ...................................................7-8
Parameter Setting Review .................................................................7-8
.................................................................7-9
...............................................................7-9
Pressure LRV/URV Configuration
.....................................................7-9
Damping Time Constant Configuration
...........................................7-10
.............................................................7-10