3. Cabling
3-34
TI 33Q01J10-01E
Routing Signal Cables
Areas for Signal Cables from Field
Signal cables from the field enter the FCS at the bottom and connect to individual node units in
the routes shown in Figure below.
F030517.ai
Front
Rear
Field wiring area
Cable solidification attachment
Front : 4points
Rear : 4points
Figure Areas for Signal Cables from Field
May 18, 2007-00