YMC Europe GmbH
Requirements for operation
YMC Pilot
16 / 49
PLUS
low pressure chromatography column
5
Requirements for Operation
5.1
Pilot column set up
Required devices:
• Drainage tubing
• Collecting vessel
The pilot column is set up as follows:
1. Make sure that the pilot column is standing on fixed ground.
2. Make sure that the pilot column is standing vertical in the final operating place.
3. Connect the drainage tubing to the drainage tubing connector.
4. Put the drainage tubing in the collecting vessel.
5.2
Pressure test
WARNING
Operation of pressure tests
Eye or skin injuries possible due to solvent leakage or incorrectly sealed connectors.
► Perform the pressure test behind a safety screen.
► During work on the pilot column, wear the prescribed personnel protective
equipment.
WARNING
Pilot column under high pressure
Eye or skin injuries possible due to remaining pressure in the tubing or in the pilot
column.
► Stop the pump during work on the pilot column.
► During work on the pilot column, wear the prescribed personnel protective
equipment.
A pressure test is used to check the tightness of both the seals in the pilot column and
also the tubing connectors. Before using the column for chromatographic applications,
it is recommended that a pressure test is performed to verify the correct assembly.
Prior to delivery of the column, the column has been tested according to the standard
procedure listed below. The relevant certificate is located in the documentation folder.