background image

 

BOLT TORQUE 

 
Mounting bolts and hardware 
 
Before operating the Residue Manager for the first time, check to be sure that all hardware 
is  tight.    Check  all  hardware  again  after  approximately  50  hours  of  operation  and  at  the 
beginning of each planting season. 
 
All  hardware  used  on  the  Residue  Manager  is  Grade  5  unless  otherwise  noted.    Grade  5 
cap screws are marked with three radial lines on the head.  If hardware must be replaced, 
be  sure  to  replace  it  with  hardware  of  equal  size,  strength  and  thread  type.    Refer  to  the 
torque values chart when tightening hardware. 
 

Important:

    Over  tightening  hardware  can  cause  as  much  damage  as  when  under 

tightening.  Tightening hardware beyond the recommended range can reduce its shock load 
capacity. 
 

The  chart  below  is  a  guide  for  proper  torque.    Use  it  unless  a  specified  torque  is  called  out 
elsewhere in the manual. 
Torque  is  the  force  you  apply  to  the  wrench  handle  or  the  cheater  bar,  times  the  length  of  the 
handle or bar. 
Use a torque wrench whenever possible. 

 
 

The following table shows torque in ft. lbs. for coarse thread hardware. 
 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

Lubricate all bearings and moving parts as assembled and make certain that they work freely. 

 
WARNING:

  Never work around the toolbar/implement while in a raised position without using safety 

lockups. 

 

CAUTION:

  The Residue Manager attachments are very heavy.  Pay extra attention to lifting techniques 

while handling and or maneuvering the opener during assembly.  Failure to do so may lead to personal 
injury. 

Содержание 2967-002B

Страница 1: ...TWIN ROW PLANTER GREAT PLAINS OPERATOR S MANUAL PART IDENTIFICATION 2565 763_REV_D 06 2021 YETTER MANUFACTURING CO FOUNDED 1930 Colchester IL 62326 0358 Toll free 800 447 5777 309 776 3222 Fax Website www yetterco com E mail info yetterco com ...

Страница 2: ...roduct according to the maintenance schedule in the operator s manual The user is responsible for inspecting his machine and for having parts repaired or replaced when continued use of the product would cause damage or excessive wear to the other parts It is the user s responsibility to deliver his machine to the Yetter dealer who sold him the product for service or replacement of defective parts ...

Страница 3: ...3 TABLE OF CONTENTS Introduction 2 Warranty 2 Table of Contents 3 Bolt Torque 4 Operation 5 6 Planter Adjustment 7 Installation Instruction 8 9 Maintenance 10 11 Parts Identification 12 15 ...

Страница 4: ...der tightening Tightening hardware beyond the recommended range can reduce its shock load capacity The chart below is a guide for proper torque Use it unless a specified torque is called out elsewhere in the manual Torque is the force you apply to the wrench handle or the cheater bar times the length of the handle or bar Use a torque wrench whenever possible The following table shows torque in ft ...

Страница 5: ... residue flow 3 DO NOT expect 100 of crop residue to be cleared it is not necessary and would necessitate engaging the soil The width of path cleared depends on ground conditions depth setting and ground speed 4 DO expect to see wheels occasionally quit turning indicates ideal shallow setting which is not moving soil 5 DO adjust toolbar frame height 20 22 and drawbar to level correctly Very import...

Страница 6: ...the planter is in the field and has been fully loaded with seed fertilizer granular chemicals etc Also a field check with a bubble level on the frame should be made of the hitch height to ensure level operation front to back It is important for the planter to operate level laterally Tire pressure must be maintained at pressures specified by the manufacturer Field and actual planting conditions cha...

Страница 7: ...7 PLANTER ADJUSTMENT ...

Страница 8: ...8 INSTALLATION INSTRUCTIONS STEP 1 Attach the Residue Manager to the planter unit using 4 bolts nuts and lock washers ...

Страница 9: ... INSTALLATION INSTRUCTIONS STEP 2 Attach the R M wheel hub assembly to the arm using 5 8 lock washer and hex nut Adjust the bearing shield to top dead center rotated slightly forward Torque to 150 ft lbs ...

Страница 10: ...e based on NLGI consistency numbers and the expected air temperature range during the service interval Use a multi purpose polyurea water resistant moderate speed and NLGI grade 2 grease IMPORTANT Some types of grease thickener are not compatible with others Consult your grease supplier before mixing different types of grease Alternative Lubricants Conditions in certain geographical areas may requ...

Страница 11: ...l service locks on all wheel cylinders At the end of the season the machine should be thoroughly inspected and prepared for storage Repair or replace any worn or damaged components to prevent down time at the start of the next season Store machine under cover with all parts in operating condition Clean machine thoroughly to remove all dirt debris and crop residue which would hold moisture and caus...

Страница 12: ...12 PARTS IDENTIFICATION 2967 002B L FW 2966 141 FW ...

Страница 13: ...13 PARTS IDENTIFICATION 2966 140 ST FW 2966 140 BW FW ...

Страница 14: ...14 PARTS IDENTIFICATION 2966 104 ARM ASSEMBLY RIGHT HAND ...

Страница 15: ...15 PARTS IDENTIFICATION 2966 106 ARM ASSEMBLY LEFT HAND ...

Страница 16: ...y as Australia and Africa So when you buy Yetter products you re buying a name that s recognized A name that s known and respected A name that s become a part of American agriculture and has become synonymous with quality and satisfaction in the field of conservation tillage Thank you YETTER MANUFACTURING CO Colchester IL 62326 0358 309 776 4111 Toll Free 800 447 5777 Fax 309 776 3222 Website WWW ...

Отзывы: