- 54 -
Engine
Tightening Point
Part No.
Part Name
Thread dia. ×
pitch
Tightening torque Nm (kgf•m)
Q'ty Remarks
Crankcase cover 1 installation
90109-06031
Bolt
M6 × 1,0
12±2 (1,2±0,2)
4
ACM cover
Crankcase cover 1 installation
92014-08035
Bolt, button head
M8 × 1,25
20±2 (2,0±0,2)
3
ACM cover
Crankcase cover 1 installation
90110-06020
Bolt, hexagonal socket
head
M6 × 1,0
10±2 (1,0±0,2)
2
Drive sprocket cover
Crankcase cover 2 installation
90110-06047
Bolt, hexagonal socket
head
M6 × 1,0
10±2 (1,0±0,2)
1
Drive sprocket cover
Crank cover 3 installation
90151-06014
Screw, cross-recessed
counter sack
M6 × 1,0
10±2 (1,0±0,2)
3
Crank left cover
Crankcase cover 2 installation
90109-06016
Bolt
M6 × 1,0
12±2 (1,2±0,2)
7
Clutch cover
Crankcase cover 2 installation
90110-06112
Bolt
M6 × 1,0
12±2 (1,2±0,2)
1
Clutch cover
Installation de couvercle 1
90109-06014
Bolt
M6 × 1,0
12±2 (1,2±0,2)
6
Cam chain cover
Installation de couvercle 1
90109-06015
Bolt
M6 × 1,0
12±2 (1,2±0,2)
4
Breather cover
Breather plate installation
90110-06018
Bolt, hexagonal socket
head
M6 × 1,0
10±2 (1,0±0,2)
3
Plate installation
90110-06004
Bolt, hexagonal socket
head
M6 × 1,0
12±2 (1,2±0,2)
2
Installation of plug to cover 1
92014-08016
Bolt, button head
M8 × 1,25
15±2 (1,5±0,2)
1
Check timing.
Installation of plug to cover 1
90340-32004
Plug, straight screw
M32 × 1,5
Close contact with seating
surface
1 For
crank
turning
Installation of plug to crankcase
cover 1
5PX-15189-00
Plug
M20 × 1,5
8±2 (0,8±0,2)
1
Oil return plug for main gallery 1
36Y-15189-00
Plug
M16 × 1,5
8±2 (0,8±0,2)
3
Main gallery 2
4H7-15189-00
Plug
M20 × 1,5
8±2 (0,8±0,2)
1
Oil return pipe
90110-06041
Bolt, hexagonal socket
head
M6 × 1,0
10±2 (1,0±0,2)
2
Oil return plug
90340-12112
Plug, straight screw
M12 × 1,0
24±3 (2,4±0,3)
2
Apply Loctite.
Stator installation
90149-06035
Screw
M6 × 1,0
14±2 (1,4±0,2)
3
Torx
Housing bearing 2 installation
90149-06020
Screw
M6 × 1,0
10±2 (1,0±0,2)
3
Installation of protector to
crankcase cover 2
92014-06014
Bolt, button head
M6 × 1,0
10±2 (1,0±0,2)
2
Thermo stay installation
91380-06014
Bolt, hexagonal socket
head
M6 × 1,0
10±2 (1,0±0,2)
2
Idler gear installation
90110-06063
Bolt, hexagonal socket
head
M5 × 0,8
10±2 (1,0±0,2)
1
Clutch boss installation
90179-20007-0
Nut
M20 × 1,0
95±5 (9,5±0,5)
1
Cramp nut.
Clutch spring installation
90159-06009-0
Bolt, flange
M6 × 1,0
10±2 (1,0±0,2)
6
Apply oil to thread.
Drive sprocket installation
90179-22003
Nut
M22 × 1,5
85±10 (8,5±1,0)
1
Bend at one point.
Installation of stopper, shift bar,
plate, & stopper 2
90110-06226
Bolt, hexagonal socket
head
M6 × 1,0
10±2 (1,0±0,2)
2
Screw stopper installation
5VY-18127-00
Stopper, screw
M8 × 1,25
22±2 (2,2±0,2)
1
Degrease thread.
Neutral switch installation
3GB-82540-01
Neutral switch
M10 × 1,25
20±2 (2,0±0,2)
1
Installation of thermo sensor (for
water temperature)
8CC-85790-01
Thermo sensor
assembly
M12 × 1,5
18±2 (1,8±0,2)
1
Содержание '04 YZF-R1
Страница 1: ... 04 YZF R1 KIT MANUAL The Performance Edge for top ranking riders ...
Страница 53: ... 49 3 7 Camshaft installation Timing matching Timing matching mark Timing matching mark ...
Страница 60: ... 56 Headlight cord wiring diagram ...
Страница 61: ... 57 2004 YZF R1 Wiring Diagram ...
Страница 62: ...YEC CO LTD 3622 8 Nishikaizuka Iwata Shizuoka 438 0026 Japan Tel 81 0538 37 4488 Fax 81 0538 37 6186 ...