![Yeasn YPB-2100 Скачать руководство пользователя страница 19](http://html1.mh-extra.com/html/yeasn/ypb-2100/ypb-2100_user-manual_3243887019.webp)
- 15 -
4.2.2 Installation of hanger frame
Place the rack against the back of the monitor so that the four outermost mounting holes on the rack
are aligned with the mounting holes on the monitor. In turn, use 4 M4×12 cross-recessed pan-head
screws to pass through 4
φ
4 spring washers, then 4
φ
4 flat washers, and then align with the 4
outermost mounting holes of the rack and pass through the mounting holes. Using the screwdriver
to screw into the four mounting holes on the monitor. Before locking the screws through the two
mounting holes on the upper end of the rack, first align and align the two mounting holes on the
adapter rack with the two mounting holes on the upper end of the rack, and then lock the screws to
complete the installation of the adapter rack.
After the adapter rack is installed, put the adapter vertically into the adapter rack.
Power adapter
Power adapter rack
Spring washer
φ
4
Rack
Plain washer
φ
4
Cross-recessed pan-head screws M4×12
Rack mounting holes
Displayer