English-
75
SERVICE JOURNAL
Action
Date, mtr reading, stamp, sign
300-Hour Service
1. Inspect the machine. Come to agreement with the customer
as to which additional work is to be carried out.
2.
Perform the 25-hour service.
3.
Perform the 50-hour service.
4.
Perform the 100-hour service.
5.
Check/adjust the mower deck.
6.
Clean the combustion chamber and grind the valve seats.
7.
Check the engine valve clearance.
8.
Replace the air cleaner’s pre-filter (foam).
Содержание 968999694
Страница 1: ...Operator s manual 968999694 ZEKH42200 968999698 ZEKH48240 968999701 ZEKH52240...
Страница 2: ......
Страница 65: ...WIRING DIAGRAMS English 63 Wiring diagram...
Страница 73: ...English 71 SERVICE JOURNAL After the First 5 8 Hours 1 Change engine oil...
Страница 78: ...English 76 SERVICE JOURNAL Action Date mtr reading stamp sign...
Страница 79: ......
Страница 80: ...530 131340IR 07 31 07...