1.
Remove the screws.
2.
Push the holding plate from the lugs. Use a screwdriver by inserting it gently
between the housing and holding plate.
3.
Pull the interface module out of the device.
4.
Reinstall the cover plate.
4.3 Commissioning
CAUTION!
–
Before commissioning the device must be brought to room tempera-
ture.
–
At condensation the device must be absolutely dry before connected
to power.
–
To avoid overheat during operation the device must not be laid open
to direct sun light.
–
After opening the control cabinet or desk, there are parts with pos-
sible dangerous voltage available.
–
For all signal connections only screened cables are permitted.
–
Signal cables must not be let within the same cable shaft as high
voltage cables.
4.3.1 VIPA Startup-Manager
As soon as the Touch Panel is provided by power supply, the
VIPA Startup-Manager
will
be loaded.
At the first startup of the
VIPA Startup-Manager
the following
start screen
appears.
There is a button on the
initial screen
with a counter, which counts backwards. If you click
on this button within this time, you can return to the
selection menu
. If the time expires,
the project will start automatically.
Demounting
Start screen
VIPA HMI
Deployment under Windows CE 6.0 Prof.
Commissioning > VIPA Startup-Manager
HB160 | TP-ECO | 62H-MHC0 | en | 17-01
50