
3 Installation
3.3 Installing and Leveling the Common Base
3-4
175932-1CD
175932-1CD
EcoTrim ET-1024 System
3.3
Installing and Leveling the Common Base
The common base is shipped on a wooden platform. To install the
common base, refer to your system drawings and proceed as follows:
1. Unbolt the common base from the platform. The bolts that secure the
common base to the wooden platform go down through the hollow
leveling screws and are threaded into the wooden platform (see
). It may be necessary to hold the leveling screws in place with
a suitable open-end wrench while removing the shipping bolts.
Figure 3-2: Stabilizing and Lag Points (Robot/Positioner Common
Equipment Base)
2. Using a forklift, lift the common base from the wooden platform.
Discard or recycle the wooden shipping skid.
CAUTION
Handle system components carefully. Some components can be
damaged if dropped or otherwise handled roughly.
WARNING
As shipped, the robot/positioner common base (with equipment)
weighs approximately 2200 kg (4409 lbs). Use a forklift that is rated for
this amount of weight load.
38 of 64