BEFORE STARTING, READ THROUGH THE ASSEMBLY INSTRUCTIONS CAREFULLY.
CHECK THOROUGHLY ALL THE PARTS YOU HAVE RECEIVED AGAINST THE PARTS DIAGRAMS
PAGES 1-3.
ENSURE THAT NO PARTS ARE DAMAGED.
ALWAYS ASSEMBLE THE ROOF FIRST, ESPECIALLY IF YOU DO NOT INTEND TO COMPLETE
CONSTRUCTION ON THE SAME DAY.
DO NOT ERECT YOUR BUILDING ON A WINDY DAY. ANY
BUILDING LEFT PARTIALLY CONSTRUCTED MAY BE
DAMAGED.
ALL ASSEMBLY OPERATIONS MUST TAKE PLACE ON A
LEVEL SURFACE.
WASHERS TO BE USED ON ALL SCREWS
THE SHED SHOULD BE SECURELY ANCHORED TO A
FIRM LEVEL BASE EG CONCRETE, PAVING SLABS OR
WOOD. CONCRETE SHOULD BE LAID A MINIMUM OF
75MM THICK AT APPROX. 25MM ABOVE GROUND LEVEL.
A SHEET OF HEAVY DUTY POLYTHENE PLACED UNDER
THE BASE AREA WILL HELP PREVENT DAMPNESS
RISING FROM THE GROUND INTO THE SHED.
GB-IE
2
YOU WILL NEED
GB-IE
IT IS RECOMMENDED THAT YOU WEAR GLOVES WHEN ASSEMBLING THIS PRODUCT
TWO PERSON OPERATION
KEEP CHILDREN AWAY DURING ASSEMBLY
SAFETY
Before you start / Safety
Содержание 1010 TYZ
Страница 6: ...5...
Страница 7: ...Step Etape Schritt Stap Paso Passo 6...
Страница 8: ...7...
Страница 9: ...X4 X4 8...
Страница 10: ...9...
Страница 11: ...10...
Страница 12: ...11...
Страница 13: ...12...
Страница 14: ...13...
Страница 15: ...14...
Страница 16: ...15...
Страница 17: ...16...
Страница 18: ...17...
Страница 19: ...18...
Страница 20: ...7mm 3mm 3mm 7mm 19...
Страница 21: ...20...
Страница 22: ...21...
Страница 23: ...22...
Страница 24: ...607EA 23...
Страница 25: ...24...
Страница 26: ...25...
Страница 27: ...26...
Страница 28: ...27...