Flush
SHINGLES - RIDGE CAP
s
You will finish off the top of the roof with a ridge cap made from shingles.
Note:
.
s
e
c
e
i
p
t
u
c
2
2
-
0
2
t
u
o
b
a
d
e
e
n
ll
i
w
u
o
Y
s
Cut shingles into THREE pieces.
Hint:
Use cut-off pieces first.
Score shingle,
then snap-off angled cut.
Install first ridge cap flush to shingles at front, as shown.
Install second ridge cap 5" back, as shown.
2
3
BEGIN
1
2"
(5 cm)
2"
(5 cm)
2"
(5 cm)
2"
(5 cm)
2"
(5 cm)
2"
(5 cm)
Top of slot.
Weather Seal
(1) Nail per side through weather seal.
5"
12,7 cm
FRONT OF
SHED
FRONT OF
SHED
Flush
20 to 22
Pieces
(1) Nail per side through weather seal.
52
Содержание STOCKTON 8' x 12'
Страница 2: ...This page intentionally left blank...
Страница 11: ......
Страница 13: ......
Страница 14: ...12...
Страница 16: ...14...
Страница 17: ......
Страница 18: ...16...
Страница 19: ......
Страница 20: ...18...
Страница 21: ......
Страница 22: ...20...
Страница 23: ......
Страница 24: ...22...
Страница 25: ......
Страница 26: ...24...
Страница 27: ......
Страница 28: ...26...
Страница 29: ......
Страница 30: ...28...
Страница 31: ......
Страница 32: ...30...
Страница 33: ......
Страница 34: ...32...
Страница 35: ......
Страница 36: ...34...
Страница 37: ......
Страница 38: ...36...
Страница 39: ......
Страница 40: ...38...
Страница 41: ......
Страница 42: ...40...
Страница 43: ...41...
Страница 44: ...42...
Страница 45: ......
Страница 46: ...44...
Страница 47: ......
Страница 48: ...46...
Страница 49: ......