49
FRONT GABLE OVERHANG
PARTS REQUIRED:
Fig. B
You have fi nished building your gable assemblies.
FINISH
2" (5,1 cm)
x48
75-1/4"
(191,1 cm)
3-1/2"
(8,9 cm)
48"
(121,9 cm)
26-1/2"
(67,3 cm)
3"
(7,6 cm)
Screws
2" (5,1 cm)
Nails
3" (7,6 cm)
Screws
ECA
ECA
CLA x4
Arrange, measure and mark locations of four
CLA
as shown place
ECA
on top.
Secure using 3" screws as shown
(Fig. A)
. Ensure parts are fl ush along edges.
2
3
4
5
1
BEGIN
Orient parts as shown
(Fig. A)
.
x4
2 x 3 x 75-1/4" (5,1 x 7,6 x 191,1 cm)
ECA
x8
2 x 4 x 4-7/8" (5,1 x 10,2 x 12,4 cm)
CLA
3" (7,6 cm)
x32
Fig. A
Flush
Flush
Flush
Flush
Flush
Panel overhang = 1-1/8"
Flush
Flip over gable ladder sub-assembly and attach
ECA
to four
CLA
using 3" screws
(Fig. B)
.
Repeat STEPS 1 - 3 to build the second front gable ladder sub-assembly.
Arrange ladders and roof panels as shown
(Fig. C)
to make a right and a left gable
assembly. Attach roof panels using 2" nails 6" apart.
Note - panel over hangs ladder 1-1/8" (2,9 cm) along edge.
Fig. C
7/16 x 9 x 27-1/4"
(1,1 x 20 x 69,2 cm)
x2
7/16 x 9 x 48"
(1,1 x 20 x 121,9 cm)
x2
1-1/8"
(2,9 cm)
1-1/8"
(2,9 cm)
Flush
Left
Right
Right
Assembly
Left
Assembly
END VIEW
6"
(15,2 cm)
7/16 x 9 x 27-1/4"
7/16 x 9 x 48"
Содержание LYNWOOD GABLE
Страница 2: ...This page intentionally left blank...