44
SAFETY HANDLES
INSTALL
Ensure Metal Handrail
is vertical and plumb.
x1
2007
1-1/2” Lag Bolt
Flat Washer
x2
METAL HANDRAIL
INSTALL
Pre-drill 1/4” pilot hole at marked location.
Re drill from opposite side using 1/2” bit.
SEE PAGE 7
SEE PAGE 7
DO NOT OVER-TIGHTEN LAG BOLTS