![Yardistry YM11909 Скачать руководство пользователя страница 18](http://html1.mh-extra.com/html/yardistry/ym11909/ym11909_installation-and-operating-instructions-manual_3184134018.webp)
18
Avery Inst 4 - Frame Assembly
E:
Make sure each corner is square and level then attach Side Beam Assembly to Post Assemblies with
one 5/16 x 4-3/4” Lag Screw (with 1/4-5/16” large washer) per corner and Gable Beam Assembly to Post
Assemblies with one 5/16 x 3” Lag Screw (with 1/4-5/16” large washer) per corner as shown below. (F5.4)
F:
Depending on what you are placing the Pavilion on will determine how you anchor it to that surface. Please
refer to pages 6 and 7 for installation examples.
Any hardware or extra materials for
mounting will have to be purchased in advance.
Hardware
4 x 5/16 x 4-3/4” Lag Screw (1/4-5/16” large washer)
4 x 5/16 x 3” Lag Screw (1/4-5/16” large washer)
5/16 x 4-3/4”
Lag Screw
5/16 x 3”
Lag Screw
F5.4
Post Assembly
Step 5: Frame Assembly and Anchoring
Part 2
Gable Beam
Assembly
Side Beam
Assembly
1/4 - 5/16”
Large Washer
1/4 - 5/16”
Large Washer
Содержание YM11909
Страница 39: ...39 support yardistrystructures com NOTES...