![Yardistry 1902316 Скачать руководство пользователя страница 6](http://html1.mh-extra.com/html/yardistry/1902316/1902316_installation-and-operating-instructions-manual_906579006.webp)
6
Step 9
Square Post to Trellis A and attach Long Gusset
2- 5/16 x 5 ¼ (5/16 flat, lock washer and T-nut)
Predrill 1 - 5/16 x3 ,1/4 shank hex lag screw (5/16 flat washer)
Show squaring unit should be 152¾ diagonally from post to post
Note: It is critically important you start with square, solid and level footings, concrete
pad or deck to attach your Pavilion.
We supply Post Mounts with this structure which gives you the flexibility to permanently install your structure
to a pre-existing or new wood or concrete surface.
• The hardware to attach the Post Mount to the structure is included.
• The hardware to mount the structure permanently will need to be purchased separately at your local
hardware store.
If you are mounting to concrete footers see below for the correct locations and placement. Please double
check for possibility of any underground utilities such as gas, telephone, cable or sprinkler lines.
Following are some examples of how to mount the structure to wood or concrete surfaces.
Refer to your local building and city codes, ordinances, neighbourhood covenants, or height restrictions
regarding this type of structure for guidance on acceptable installation requirements.
Permanent Installation Examples
Concrete Footer
To
Required
Depth
Anchoring Hardware not included
Post Mount
(106-1/2”)
Plinth to Plinth
Plinth to Plinth
(12’ 8-3/4”)
Post to Post
(108”)
Post to Post
(106-1/2”)
(108”)
Post to Post
2.743 m
2.743 m
2.705 m
2.705 m
3.88 m
Содержание 1902316
Страница 30: ......
Страница 31: ...31 support yardistrystructures com NOTES ...