background image

Tools Required for Job

#2 Square

D

rive Tip

(included)

Cordless

Drill

25’ Tape

Measure

Mt. Vernon Arbor

Assembly Manual

Thank you for your purchase of this 

arbor

.

This manual is designed to simplify the assembly process

.

 Please read through the entire manual before 

starting!

Take a deep breath and get at it; the satisfaction and enjoyment of this 

arbor

 is only a few 

minutes

 away. Have 

fun!

You have purchased a product that consists of bulky pieces. With your purchase, you assume full          

responsibility to have the necessary manpower 

available to assemble the product.

 You also agree that any 

damage that happens to the product

 d

uring the entire construction process is your responsibility

and neither 

the seller, nor the manufacturer, will be held liable for any such damage.

Hammer

Содержание Mt. Vernon Arbor

Страница 1: ...Assembly Manual Mt Vernon Arbor ...

Страница 2: ...ath and get at it the satisfaction and enjoyment of this arbor is only a few minutes away Have fun You have purchased a product that consists of bulky pieces With your purchase you assume full responsibility to have the necessary manpower available to assemble the product You also agree that any damage that happens to the product during the entire construction process is your responsibility and ne...

Страница 3: ...Parts List 2 Finials 2 Arches 2 Arbor sides 2 Arch Plates 5 Spindles 2 Caps ...

Страница 4: ...indles and gently tap on top of arch Spacing on outside of arches should measure 33 5 Fasten spindles to arch using 2 5 screws provided Holes are pre drilled on top side of arch Turn Arbor top upside down on smooth surface Align arch plates on arch using markings on plate Step 1 Step 2 Step 4 Step 6 Step 5 Step 3 33 5 ...

Страница 5: ...finials Align pre drilled hole in cap with pre drilled hole in arch Fasten finial and plate to the arch by hand turning finial with lag through the pre drilled holes Repeat on opposite side Your completed arbor top should look like this You are now ready to fasten the arbor sides to the arbor top Step 11 Step 12 Step 10 Step 9 Step 8 Step 7 Patiova com Info Patiova com 6649 N Moscow Road Parkesbur...

Страница 6: ...ed Holes are pre drilled on arbor side top plate Repeat step 13 on opposite side Congratulations Your arbor is now complete Place on level ground at desired location Anchor to ground with four anchors provided Step 15 Step 14 Step 13 Patiova com Info Patiova com 6649 N Moscow Road Parkesburg PA 19365 610 857 1359 ...

Отзывы: