5
Backyard Cliff Climb Assembly Man
ual
Position floor deck on side panel. Bottom of
decking should be resting on top side of angled
2x6.
Fasten floor deck to 4x4 using two 5/16x 2.5" lag
screws. Be sure decking is pulled down against
angled 2x6 before fastening with lags. Fasten joist
at both 4x4's. Fasten where the yellow arrows are
pointing.
Fit other side panel into position.
Fasten this side repeating step 8.
Fasten 2x4 to side frame using two 5/16x 2.5"
lags.
Be sure 2x4's are properly aligned.
Make sure everything is pulled together.
This is important for the swing beam
attachment.
Step:11
Step:12
Step:10
Step:9
Step:8
Step:7
Patiova.com
Info@
Patiova.
com
6649 N. Moscow Road Parkesburg, PA 19365
610-857-1359
Содержание Backyard Cliff Climb
Страница 1: ...Assembly Manual Backyard Cliff Climb...