YARDART Williamsburg FT-133 Скачать руководство пользователя страница 2

FT-133 Williamsburg Pineapple Fountain 

Two people are recommended for the installation of this fountain!

 

Revised July 21, 2017 

Assemble your fountain on a level surface capable of holding a minimum of 315 pounds with an approximate 1 square foot footprint. 

 

 

 

 

FT-132G (135 lbs) 

12.75”W x 25.75”H 

 

 

FT-132F (111 lbs) 

30”W x 8.5”H 

 

 

FT-133B (8 lbs) 

9”W x 5.75”H 

 

 

FT-133A (17 lbs) 

7”W x 9.75”H 

 

 

FT-133C (1 lb) 

5”L x 1.25”W x 4”H 

 

 

 

 

 

 

 

1.

 

Place the base (FT-132G) into position where the fountain will be installed, ensuring 

that it is level. 

 

 

 

 

 

 

2.

 

Center the large bowl (FT-132F) on the base (FT-132G) 

3.

 

Assemble the pump kit 

a.

 

Using a hose clamp, attach the 12” piece of 1/2” non-kink tubing to the 

pump outlet. 

b.

 

Place a hose clamp over the 5/8” clear end of the tubing. 

c.

 

Place the stopper around the pump cord approximately 8” from the pump. 

4.

 

Feed the pump cord through the hole in the large bowl (FT-132F) and through the 

base (FT-132G). 

5.

 

FIRMLY

 press the stopper into the hole evenly. 

a.

 

Note: Using the handle of a screwdriver or hammer works best to press the 

stopper in place. 

 

 

 

6.

 

Place the pump cover (FT-133B) over the pump and in the center of the large bowl 

(FT-132F). 

 

 

 

 

 

 

7.

 

Using the hose clamp, connect the 5/8” clear tubing to the copper pipe protruding 

from the bottom of the finial (FT-133A). 

8.

 

Center the finial (FT-133A) on the pump cover (FT-133B). 

 

 

 

 

 

 

9.

 

Fit the pump cover door (FT-133C) into the pump cover (FT-133B). 

 

10.

 

Fill the fountain with water. 

Отзывы: