RT70 Operator’s Manual
Maintenance - 151
Tractor Procedures
Tractor Procedures
Axle Spindle Pins
Lube at zerk (shown) with EPG every 250 hours.
Parking brake
Radiator
Seat belt
Tires
Track hub bolts
Track pivot bearings
Track rollers and sprocket
Track tension
Universal joints
Water separator
Service
Be
fo
re
S
ta
rt
up
10
H
ou
rs
50
H
ou
rs
10
0
Ho
ur
s
20
0
Ho
ur
s
50
0
Ho
ur
s
10
00
H
ou
rs
20
00
H
ou
rs
As
N
ee
de
d
t63om027h21.eps
t63om027h21.eps
Содержание RT70
Страница 9: ...Overview 8 RT70 Operator s Manual About This Manual ...
Страница 19: ...Safety 18 RT70 Operator s Manual Emergency Procedures ...
Страница 31: ...Safety 30 RT70 Operator s Manual Attachment Safety Alerts ...
Страница 83: ...Controls 82 RT70 Operator s Manual Seat ...
Страница 89: ...Drive 88 RT70 Operator s Manual Shut Down ...
Страница 97: ...Transport 96 RT70 Operator s Manual Haul ...
Страница 103: ...Backhoe 102 RT70 Operator s Manual Finish Job ...
Страница 123: ...Reel Carrier 122 RT70 Operator s Manual Finish Job ...
Страница 129: ...Trench 128 RT70 Operator s Manual Finish Job ...
Страница 141: ...Systems and Equipment 140 RT70 Operator s Manual Counterweights ...
Страница 145: ...Maintenance 144 RT70 Operator s Manual Trencher Maintenance Interval Chart 183 Trencher Procedures 184 ...
Страница 221: ...Specifications 220 RT70 Operator s Manual EU Declaration of Conformity ...