RMB/ENERGIE GmbH | 19
Display and operation
Manual neoTower
®
Power Storage | (02/2022)
is necessary for some BOS constellations if the
CHP unit is not started by a starter. The starting
current would overload the system and the CHP
unit would not be able to start (set value in watts).
Standalone
operation:
Display whether standalone operation is active
(mains failure).
Power per phase:
Release display indicating whether the power per
phase to start the CHP is OK.
Battery SoC OK:
Release display indicating whether the power per
phase to start the CHP is OK.
CHP start-up enabled:
Display for overall release for CHP start-up in
standalone mode (all the above releases must be
enabled).
Power specifications, mains network supply:
Specification of how many watts are to be
permanently supplied to the mains network or
taken from the mains network (set value in watts).
Power L1/L2/L3:
Display of the current power on the mains side in
watts.
Current L1/L2/L3:
Display of the present current on the mains side in
amperes.
Power L1/L2/L3:
Display of the current power on the building side in
watts.
Current L1/L2/L3:
Display of the present current on the building side
in amperes.
VE.Bus error:
Currently signalled error message of the BOS
system in plain text.
Technician password:
Entry of the technician password to enable
modification of the set values.