2. Go on pulling the bracing cord until the tower stands upright. Separate the working cord and fix

it on its anchor.

3. Check and adjust the strain of each fixed wire cable. Over tight force may bend the tower while

over loose force may cause the tower unstable and shakable. The perfect force is neither too

loose nor too tight and can be adjusted through circumrotating the bolt.

Installation specification of taper tower

Step 1: Choosing installation sites

Please refer to the installation specification of guyed tower (Step 1)

Step 2: Concrete the base

Refer to the following graphs according to the different product model. Special attention should

be paid to the consistent between anchor and the opening of tower base.

Graph 8

Содержание FD10.0-20K-40H

Страница 1: ...henzhou Wind driven Generator Co Ltd USER S MANUAL 2007 04 13 Yangzhou Shenzhou Wind driven Generator Co Ltd Add Xinhe Industrial Park Xiannv Town Jiangdu City Jiangsu Province Post code 225267 Phone 0514 6292873 ...

Страница 2: ...ered Tower 13 Configuration Specification of Batteries 15 Electric Wiring 16 Maintenance 17 FAQS 17 Annex one Off grid Electric Wiring 19 Annex Two Controller Specification 3kw above 3kw 20 Annex Three Specification of wind speed monitor 22 Annex Four Specification of Analyzing System for Wind speed Gathering 27 ...

Страница 3: ...0 10H Rated power W 500W 1KW Rated voltage V 24 48 Rotor diameter M 2 5 2 1 2 7 2 3 Start up wind speed m s 2 2 Rated wind speed m s 8 12 9 12 Security wind speed m s 16 35 16 35 Rated rotating rate r m 400 400 Blade material glass fiber glass fiber glass fiber glass fiber Blade quantity 3 3 Model FD3 6 2000 10L FD3 6 2000 10H FD5 0 3000 16L FD5 0 3000 16H Rated power W 2000W 3000W Rated voltage V...

Страница 4: ...m s 10 12 10 12 Security wind speed m s 25 45 25 45 Rated rotating rate r m 200 180 Blade material glass fiber glass fiber glass fiber glass fiber Blade quantity 3 3 Model FD10 0 20K 40H Rated power W 20000W Rated voltage V 360 Rotor diameter M 10 0 Start up wind speed m s 2 Rated wind speed m s 12 Security wind speed m s 45 Rated rotating rate r m 90 Blade material glass fiber Blade quantity 3 ...

Страница 5: ...rter the distance is the less cable would be used As a result less energy waste would be produced during the transmission While under the circumstances of longer distance it s better to use much thicker standard cable for the transmission Step 2 Layout of Tower Base Anchor as shown in the following tables Model 200W 300W 500W 1000W 2000W Semi diameter m 2 0 3 0 3 0 3 0 4 0 Size of central base m l...

Страница 6: ...d for the sake of easy adjustment Otherwise too tight or too loose fastening pull will lead to the curvature or even breakdown of tower while erecting the tower Step 3 Concrete the Foundation of Base as well as Anchor and Install Tower Base 1 Follow the layout of the above step dig the concrete construction holes Please refer to the chart one above for the size of the holes 2 C25 concrete should b...

Страница 7: ...ar anchors need to be deposited 60 to 80 along the base direction and check the distance between the four hooks of the anchors and the center of the base Four anchors should be horizontal as shown in the graph 3 Graph 3 ...

Страница 8: ... cables from the main section of tower near the tail edge 4 Fix the running flange and tower flange by bolts Hoist it by equipments such as pulleys chain block etc Pay attention that the generator axis should be faced upward in order to install the blades 5 Install the blades and cover the pressure pad 300W wind turbine having no pressure pad then screw the bolts Keep the balance of blades when in...

Страница 9: ...1 500w 1kw 2kw 30Nm 1 3kw 5kw 10kw 20kw 50Nm 1 Note Please keep to the above make sure If not we are not responsible for any possibility of breaking down the blades or flange 6 After adjusting the equal distance between the blades tips screw down the bolts according to the order as shown in the graph 6 300W having three blade bolts screwing them down one by one ...

Страница 10: ... both right and left sides should be directly connected to side anchor through turnbuckle Cable wire behind should be fixed on back anchor according to the same length Make sure there is no twist among the three cable wires 2 Connecting the two supporting poles 3 Fix the two relative thin cable wires on the two ears of supporting pole and then make the cable wire before the tower drill through the...

Страница 11: ...t fixed wire cable to the one which is at least 16 meters Tie one end to the winch or tractor 2 Drill the wire cable or bracing cord through one end of the ladder 2 4 or 2 5 which will be served as support pole Step 6 Erecting the tower 1 Drive the winch or tractor slowly and the tower will stand up along the moving of the cord Stop at each rising 15 and check the tensile force of wire cable on bo...

Страница 12: ...and shakable The perfect force is neither too loose nor too tight and can be adjusted through circumrotating the bolt Installation specification of taper tower Step 1 Choosing installation sites Please refer to the installation specification of guyed tower Step 1 Step 2 Concrete the base Refer to the following graphs according to the different product model Special attention should be paid to the ...

Страница 13: ...personnel Non working people should be far away from the site when hoisting 1 Utilized by supporter on the upper side of pole and hoist gradually 2 When the tower has been erected face the open hole on tower base to the cotter bolt and screw down the bolt nut Configuration Specification of Batteries 1 Batteries should be placed inside buildings under dry and constant temperature After finalizing t...

Страница 14: ... 120 240 360 Table 4 Electric Wiring 1 Off grid electric wiring annex 1 To ensure the safety and easy maintenance please install the switch and fuse according to the diagram Make sure there are consistent among the output voltages of generator battery voltage and input voltage of inverter A wire connecting mistake will lead to burn down the generator batteries and inverter Special attention to 3kw...

Страница 15: ... by local regulations What is more on grid controller and inverter need to be purchased additionally Maintenance Wind turbine may be operated under extremely harsh environment or meet various complicated weather Therefore fix date examination and maintenance are necessary in order to keep the system operate rightly Do the following check every three months 1 Check the tight wire is too loose or to...

Страница 16: ...oltage of generator by a multi meter If the voltage is normal please check the batteries is ok otherwise check the wire of generator Why does not the rotor roll at a normal wind speed If the output wire of generator is short the rotor will not roll Check the generator s wire after disconnected from batteries How to lay down the generator For 3KW above 3KW 1 Firstly we should stop the generator Cha...

Страница 17: ... whether the dogvane is broken or not The concrete way is to unplug the plug of dogvane from controller and you will see there are three line on dogvane with marks Measure the resistance between and by multi meter the resistance should be appropriately 1000Ω and then measure the resistance between and along with and The resistance figure of these two and and should be equal to the resistance figur...

Страница 18: ...ase contact us by phone or E mail The color of photographs may be different from real objects No notification if the manual modified The guarantee of turbine and controller is 2 years and the inverter is 6months from the date of purchasing non done by man or majeure ...

Страница 19: ...19 Annex 1 Off grid electric wiring ...

Страница 20: ...ind and achieve shutdown 4 The system will continuously check the batteries voltage when the system is under normal state of generating power The system will alarm automatically when over voltage or under voltage When over voltage shutdown order will be sent out The over voltage alarm is set on 300V alarm voltage cancellation 280V and under voltage alarm 210V when it leaves factory 5 The function ...

Страница 21: ... system will continually check battery voltage under normal operation state When over or under voltage the system will alarm automatically and send out the shutdown order Note anemoscope should be installed on the wind turbine system of 3KW and above 3KW otherwise the system will not be operated normally ...

Страница 22: ...ed and wind scale together with alarming when the wind is weak or strong It consists of wind speed sensor FS10 wind speed scope FS100 and connecting wire The users can learn the local wind resource with the help of this system Front of wind speed scope Picture 9 Picture 9 Back of wind speed scope wire connecting way Picture 10 ...

Страница 23: ...23 Picture 10 Wind speed sensor FS10 Picture 11 Picture 11 Structural features Picture 12 ...

Страница 24: ... Wmin state there will be alarming Press any key will make the alarming sound nonexistent 5 Over wind speed Wmax indicating light When the wind speed is under W Wmax state there will be alarming Press any key will make the alarming sound nonexistent 6 Function key after pressing this key you will enter into the menu of setting parameter at this time the cursor will shine on the first figure 7 Figu...

Страница 25: ...ll enter into the setting menu of Wmin and Wmax as shown in the diagram 14 Setting way is the same as what mentioned in a c After having all the figures set press the function key once again the liquid crystal will display the menu parameter has been set diagram 18 diagram 19 Diagram 13 Diagram 14 3 Alarming relevant display 1 Over wind speed alarming wind speed W Wmax e g diagram 15 background li...

Страница 26: ...hen under the state of W Wmin the alarming will be unchained W min return difference of under wind speed W min Wmin should be set If under wind speed alarming is not needed please set W min and Wmin on zero Wind Speed Low 02 2m s 2 level Diagram 16 Note wind speed Low means the wind speed is too low 02 2m s means wind speed is 02 2m s 1 level means wind scale is 1 3 Press any key and the alarming ...

Страница 27: ...quid crystal screen and keyboard contribute to the easy and convenient operation of FS200 It can also communicate with computer that is to record the data of wind speed and wind direction to computer which will be observed and analyzed by FS200 Feature 1 Running mode of low power consumption FS200 will automatically turn off the nixie tube and the liquid crystal screen so it can run in mode of low...

Страница 28: ... FS200 3 Connecting FS200 to power supply 12V power supply is applied to FS200 Connect FS200 TO 12V power supply Special attention paid to the anode and cathode do not reverse them Check the wind speed sensor connection between wind speed sensor and correct connection of FS200 power supply If there is no problem concerning these aspects you can electrify When FS200 are running the present wind spe...

Страница 29: ... the move of cursor press to enter the menu option press to return to the up menu press to increase decrease the parameter MENU Picture 18 Picture 18 System time setting Pic19 Picture 19 to change the system time to exit the set of system time then auto update the ...

Страница 30: ...e history data 1min 60min adjustable Supposed that it is set 2minute and then the time of PH3000 can record is 8000 30min 24 hours 11 days Alarm set Picture 21 Picture 21 When wind speed exceeds the upper limit relay is closed then alarm The function is optional Local address Picture 22 ...

Страница 31: ...ter and have the FS2000 computer software run The PH computer software is served as reading the present wind direction checked by dogvane Download the history data of wind direction saved by dogvane and save the history data to the database of Microsoft ASSEDD Analyze the data through table or curve view The computer software can also set the parameters of the real time clock and history data reco...

Страница 32: ...ud rate on 9600bps and then open the serial Read the setting data Click the button of downloading the present setting to read data of the present wind speed and wind direction Or click pane before the words update the setting data automatically and then choose the time interval of updating automatically The software will read the present wind speed and direction automatically at a regular time ...

Страница 33: ... of Microsoft Access Users can observe and analyze history data of wind speed by table or curve view Setting system parameter Diagram 24 Diagram 24 Serve as reading or setting the system parameter of anemoscope The system parameter of anemoscope includes clock parameter time interval of history record and alarm set Setting of supporting angle Picture 25 ...

Страница 34: ...al record you need to check and then click the curve view The curve diagram of history record will be shown There are two types of displays namely overall display and partial display Diagram 26 Read the concrete parameter with the help of a rectangular Rose diagram of wind Diagram 27 ...

Страница 35: ...35 Rose diagram of wind can illustrate the distribution and scope of different wind direction all the year round Diagram 27 ...