Yangzhou Shenzhou Wind-driven Generator Co.,Ltd
URL: www.f-n.cn
5.3 Assemble the tower
【
2kw and below 2kw
】
Put the tower into the base, and insert the pins
in to the hole for it with screwing the pin shaft nut. As below,
【
3KW to 5KW
】
Connect the two section of subsidiary pole together, and
insert it into the main tower, as below,