background image

A05G072 

 

 

Pipe configuration illustrated below

 

 

System configuration    (Example) 

 

 

 

 

 

 

 

 

 

 

 

 

5.

 

OPERATIONS

 

 

After correct installation, turn on the power  control switch to start the pump. Both 
direction of the motor are suitable for the pump. 

 

Make sure all the pipes are connected properly and no leakage before start the pump. 

 

If source tank fluid level is higher than pump head the fluid should flow into pump 
head automatically. In this case, start pump then the transporting should begin. 

 

If pump was installed above the source tank, pump may not be able to suck fluid into 
pump spontaneously.    In this case a check valve should be installed.(Sucking head is 
not a guarantee.) 

 

To change the discharge  rate, loosen the fix-nut  then  turn the flow regulator knob 
while the pump is running.(Do not turn the flow regulator knob when pump is stop). 
Set the indicator between 0-12mm(clockwise to reduce discharge  rate  and  the 
opposite to increase). When indicator monitor at “12”, the stroke is at full length, 
when  at  “0”, stroke is 0  mm. stroke length. The pump discharge  rate  is  relative  to   
the stroke length proportionally.  (See page 7.). 

 

Turn  flow regulator knob  for one circle(360 degrees) the knob move 1unit(mm) on 
the indicator . 

 

For a precise flow control, after installation user should run a calibration before use. 

 

Содержание HP Series

Страница 1: ...A05G072 1 ANGTECH ENGLISH 20 03 HP SERIES DIAPHRAGM METERING PUMP FOR MODEL HP 1315 1330 1715 1730 YANGTECH TECHNOLOGY CO LTD Taiwan O P E R A T I O N M A N U A L...

Страница 2: ...th the power source and connection are correct before use If use a inverter as power supply the frequency variation range should between 30 60Hz Frequency below 30Hz for a long period of time may caus...

Страница 3: ...List Material Code AC AF BS VS SS Application Acid Oxidative Acid Base Thick Solvent 1 Pump Head PVC PTFE PVC PVC SUS304 2 Valve Ball Ceramic Ceramic SUS316 SUS316 SUS316 3 Valve Seat PVC PTFE PVC PV...

Страница 4: ...base HP3 26 1 set SUS304 2 Pipe injector Anti Siphon include 1 piece 1 0 PVC Glue on type If Optional items are necessary purchase them in the same order 4 INSTALLATION Conform both the power source...

Страница 5: ...h drain valve Output pipe may install following devices to solve some problems Pulse reducer To reduce pipe vibration especially pipe is long thin plenty of elbows Pressure gauge To monitor output pip...

Страница 6: ...o suck fluid into pump spontaneously In this case a check valve should be installed Sucking head is not a guarantee To change the discharge rate loosen the fix nut then turn the flow regulator knob wh...

Страница 7: ...luid H2O Temperature 25 Power Source 220V 3 60Hz Stroke length 100 12mm Pulse rate 200 Pulses min Pressure unit kg cm2 Note 1 Pipe altitude length number of valves liquid viscosity pressure all these...

Страница 8: ...perature or bad ventilation Improve temperature and ventilation of the environment 3 No fluid output Motor is stop Check with ITEM 1 Blocking of the inlet pipe or foot valve Eliminate from blocking Da...

Страница 9: ...ors are clean and tight regularly Avoid the chemical splash on the pump If do wash off immediately Check for abnormal noise temperature higher then 70 leakage regularly Solve them according to the COM...

Страница 10: ...A05G072 10 9 CONNECTOR DISASSEMBLE ILLUSTRATION...

Страница 11: ...9 3 3 15 7 13 1 7 8 6 5 7 0 cm2 7 6 6 3 3 8 3 2 7 3 6 1 10 0 3 5 2 9 2 Pressure Max kg cm2 PVC PVDF 7 0 10 0 5 0 7 0 SUS 12 0 3 Stroke Length mm 0 0 12 0 4 Pulse Rate pulse min 116 97 58 48 116 97 58...

Страница 12: ...A05G072 12 YANGTECH YANGTECH TECHNOLOGY CO LTD Taiwan...