Monitoring Data
Current power consumption, accumulated hours of operation, etc. may be viewed by
using the data monitoring feature.
Setting information shown in upper display cannot be modified.
1 Applicable value shows in upper
display
Monitoring items may be viewed in standby or while
operation is in progress.
Press and Hold .
Monitor items display screen activates and current item
is shown in upper display.
Press to scroll thru items and back to standby
screen:
:
Current power consumption (in kW) is power
consumed from moment of activation, and
calculated in hourly increments.
Shown as in standby. May be shown as
or during temperature stabilization.
:
Accumulated power consumption (in MWh).
Shown in three-digits up to 999.
:
Accumulated power consumption (in kWh).
Shown in three-digits up to 999.
Example
If total kilowatt hours is 123,456,
“123” (being in
thousands of kW) will be shown in the screen,
while “456” is shown in the next screen.
:
CO
2
emissions volume (in t -
“tons”).
Shown in three digits up to 999.
CO
2
emissions is calculated by multiplying the power
consumption by an emissions coefficient. Obtain an
applicable coefficient from the servicing utility
authority. Initial value is calculated on the factory
default setting of 0.550 (k-CO2/kWh). See
“Setting
and resetting the monitor indication, P.43.
:
CO
2
emissions volume (in kg). Shown in
three digits up to 999.
Example
If total CO
2
emissions volume is 456,789kg,
“456” (being
in thousands of kg) will be shown in the
screen,
while “456” is shown in the next
screen.
Содержание DF412/612
Страница 17: ...14 4 OPERATION PROCEDURE Operation Function Flow ...
Страница 68: ...65 12 WIRING DIAGRAMS DF412 612 Wiring Diagram ...
Страница 69: ...66 12 WIRING DIAGRAMS DH412 612 Wiring Diagram ...