14. SETUP CHECKLIST
*
Setup DE/DT series units using the following procedure:
Model
Serial number
Installation Date
Installed by (company or
personnel)
Installation approved
by
Assessed
by
No.
Item
Procedure
Section & Reference Page
Assessed
by
Specifications
1
Accessories
Verify inlcuded accessories against
accessories column.
10. Specifications
59
2
Installation
・
Check site visually.
Caution: check for hazards
2. Pre-operation Procedures
1. Choose Appropriate Site
for Installation.
4~7
・
Prepare installation space.
・
Install chamber racks
5. Handling Precautions
7. Arranging test samples
47
Equipment Operation
1
Power Source
Voltage
・・
Measure line voltage (facility
power outlet or terminal) with
voltmeter.
・
Measure line voltage during
operation.
(Must meet required voltage
rating)
Caution: confirm facility power
source rating meets unit
requirements
2. Pre-operation
Procedures
7. Connect power cable to
proper power supply
9. Ground wire must be
connected
10.Specifications
Power Supply (Required)
5
6
7
58
2
Operation
・
Start operation.
2. Pre-operation
procedures
Installation Precautions
4. Operation procedure
Setting Time & Date ~
Service & Repair
4~7
12~
57
Description
1
Operation
Explain function of each component
as written in instruction manual.
4. Operation Procedure
Setting Time & Date
1. Safety Precautions ~
14. List of Hazardous
Substances
12
3~
64
2
Error codes
Explain error codes and reset
procedures as written in instruction
manual.
8. Error Codes ~
15. Setup Checklist
54~
65
3
Maintenance
and inspection
Explain function of each component
as written in instruction manual.
6. Maintenance Procedures
Inspection & Maintenance 52
4
Setup
checklist
completion
・
Fill in installation date and name of
installing personnel or company
on unit “OK and Service Sticker”.
9. Service & Repair
57