6
AB-5961
Wiring (common instructions for 7803 series
and 7813 series)
1) Dismount the cover.
(i) Cable connection
Prepare the proper seal connector (order separately)
in advance, if required.
Screw the threaded seal connector into the main and
lead the cable through it.
(ii) Conduit connection
According to the number of cable cores, prepare a
conduit set (order separately) in advance. Fix the
conduit connector and the attachment tentatively with
a screw. Select an O-ring ideal for the cable.
Lead the calbe, as shown in the following diagram.
Pull up the cable and fix the attachment to the main
unit with a screw.
Tighten the nut on the conduit at a point where the
conduit lock screw can be tightened easily.
2)Connect the wires to the terminals and close the cover.
Tighten the seal connector. (only when cable
connected)
Terminal Nos. and cable cores
Nut attached to conduit
Attachment
Conduit connector
(nominal size: 25 mm)
Tighten
Allow sufficient
service clearance
〜
(+)
Pt 100
1
2
3
4
5
6
7
A
B
B
24 V AC
(24 V DC)
1-5 V DC
0-10 V DC
4-20 mA
HTY7803T1P00
HTY7803T4P00
HTY7803T6P00
HTY7813T1P00
HTY7813T4P00
HTY7813T6P00
(Cable cores:7)
⊥
(–)
+
–
TY7803Z0P00
TY7813Z0P00
(Cable cores:3)
HY7803T1000
HY7803T4000
HY7803T6000
HY7813T1000
HY7813T4000
HY7813T6000
(Cable cores:4)
Power
supply
Humidity
Temp-
erature
Pull the cable
Tightening direction
Nut attached to conduit
Conduit connector
(nominal size: 25 mm)
Conduit lock
screw
Attachment
O-ring
Straight box connector
(nominal size: 24-25 mm)
Seal connector
(order separately)