– 38 –
Parts List
Installation
1. Assembling the primary funnel
Secure the primary funnel 1 and 2 to the
throttle body with the supplied button head
bolts. At this time, install the STD lever 1 and
2. Assembling the secondary funnel
Install the secondary funnel to the lever 1
assembling positions. (5 locations)
Ycci System Control
You can use the Ycci system as the kit funnel.
You can control the operation timing by using
the YMS software packed together with the
kit ECU.
You can also control the STD funnel by using
the YMS software.
No.
PART No.
PART NAME
Q'TY
REMARKS
1
B3L-14479-80
SECONDARY FUNNEL
1
2
B3L-14469-80
PRIMARY FUNNEL 1
1
*
3
92014-06025
BUTTON HEAD BOLT
3
4
B3L-1446C-80
PRIMARY FUNNEL 2
1
*
5
92014-06025
BUTTON HEAD BOLT
3
TIP
The STD seal rubber is not used at the
bottom surface (face to the primary
R1 EN2911 2019Rev
R1 EN0102 2022Rev
Содержание YZF-R1 2022
Страница 1: ......
Страница 17: ... 14 The name and function of each switch Left Right R1 EN0102 2022Rev ...
Страница 50: ... 47 ...
Страница 51: ... 48 Transmission Assembly ...
Страница 53: ... 50 Parts List No PART No PART NAME Q TY REMARKS 1 90179 22018 NUT 3 2 90208 22002 WASHER CONICAL SPRG 3 ...
Страница 62: ... 59 9 Assemble 1 25 and 34 using 7 8 9 and 33 10 Assemble the 19 to the 10 and 13 19 13 10 R1 EN0102 2022Rev ...
Страница 67: ... 64 References ...
Страница 92: ... 89 4 ...
Страница 93: ......
Страница 95: ...Published by YAMAHA MOTOR ENGINEERING co LTD ...