![Yamaha YZ450F(E) 2014 Скачать руководство пользователя страница 221](http://html.mh-extra.com/html/yamaha/yz450f-e-2014/yz450f-e-2014_owners-service-manual_946381221.webp)
VALVES AND VALVE SPRINGS
5-26
EAS1SL1221
CHECKING THE VALVES AND VALVE
GUIDES
1. Measure:
• Valve-stem-to-valve-guide clearance
Out of specification
Replace the valve
guide.
2. Replace:
• Valve guide
TIP
To ease valve guide removal and installation,
and to maintain the correct fit, heat the cylinder
head to 100°C (212°F) in an oven.
▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼
a. Remove the valve guide with the valve guide
remover “1.”
b. Install the new valve guide with the valve
guide installer “2” and the valve guide re-
mover “1.”
c. After installing the valve guide, expand the
hole in the valve guide with the valve guide
reamer “3” to obtain the proper valve-stem-
to-valve-guide clearance.
Valve-stem-to-valve-guide clearance =
Valve guide inside diameter “a” -
Valve stem diameter “b”
Valve-stem-to-valve-guide clear-
ance (intake)
0.010–0.037 mm (0.0004–0.0015
in)
Limit
0.080 mm (0.0032 in)
Valve-stem-to-valve-guide clear-
ance (exhaust)
0.020–0.047 mm (0.0008–0.0019
in)
Limit
0.100 mm (0.0039 in)
1
2
4
5
3
Valve guide installation height “a”
Intake
15.1–15.5 mm (0.59–0.61 in)
Exhaust
12.2–12.6 mm (0.48–0.50 in)
1
Содержание YZ450F(E) 2014
Страница 4: ......
Страница 10: ......
Страница 12: ......
Страница 16: ...LOCATION OF IMPORTANT LABELS 1 2 EUR ...
Страница 17: ...LOCATION OF IMPORTANT LABELS 1 3 AUS NZL ZAF ...
Страница 42: ...CLEANING AND STORAGE 1 28 ...
Страница 70: ...LUBRICATION SYSTEM CHART AND DIAGRAMS 2 27 ...
Страница 72: ...LUBRICATION SYSTEM CHART AND DIAGRAMS 2 29 ...
Страница 74: ...LUBRICATION SYSTEM CHART AND DIAGRAMS 2 31 ...
Страница 76: ...CABLE ROUTING DIAGRAM 2 33 EAS1SL1064 CABLE ROUTING DIAGRAM ...
Страница 78: ...CABLE ROUTING DIAGRAM 2 35 ...
Страница 80: ...CABLE ROUTING DIAGRAM 2 37 ...
Страница 82: ...CABLE ROUTING DIAGRAM 2 39 ...
Страница 84: ...CABLE ROUTING DIAGRAM 2 41 ...
Страница 86: ...CABLE ROUTING DIAGRAM 2 43 ...
Страница 158: ...HANDLEBAR 4 32 For installation reverse the removal proce dure Removing the handlber Order Part name Q ty Remarks ...
Страница 192: ...CHAIN DRIVE 4 66 ...
Страница 213: ...CAMSHAFT 5 18 6 Install Cylinder head breather hose Spark plug Spark plug 13 Nm 1 3m kgf 9 4 ft lbf 4 4 4 3 2 1 T R ...
Страница 270: ...TRANSMISSION 5 75 ...
Страница 278: ...WATER PUMP 6 7 ...
Страница 290: ......
Страница 297: ...CHARGING SYSTEM 8 7 EAS1SL1324 2 AC magneto 3 Rectifier regulator 4 Joint connector 5 Condenser ...
Страница 299: ...CHARGING SYSTEM 8 9 ...
Страница 325: ...FUEL PUMP SYSTEM 8 35 ...
Страница 326: ...ELECTRICAL COMPONENTS 8 36 EAS1SL1332 ELECTRICAL COMPONENTS EAS1SL1333 9 10 1 2 3 4 5 6 7 8 ...
Страница 328: ...ELECTRICAL COMPONENTS 8 38 CHECKING THE SWITCHES B Y P Sb 2 1 ...
Страница 329: ...ELECTRICAL COMPONENTS 8 39 1 Engine stop switch 2 Neutral switch ...
Страница 338: ...ELECTRICAL COMPONENTS 8 48 ...
Страница 346: ...LIST OF SELF DIAGNOSTIC AND FAIL SAFE ACTIONS 9 7 ...
Страница 357: ......
Страница 358: ...PRINTED IN JAPAN E PRINTED ON RECYCLED PAPER ...