WATER PUMP
6-7
•
Impeller shaft gear “3”
•
Collar “4”
•
Circlip “6”
TIP
Install the impeller shaft gear with the dowel pin
fitted in the groove “a” in the same gear.
5. Install:
•
Dowel pin “1”
•
Gasket “2”
6. Install:
•
Water pump housing “1”
•
Water pump housing cover bolt “2”
•
Copper washer “3”
•
Coolant drain bolt “4”
Water pump housing cover bolt
10 N·m (1.0 kgf·m, 7.4 lb·ft)
Coolant drain bolt
10 N·m (1.0 kgf·m, 7.4 lb·ft)
Ne
w
Ne
w
T
R
.
.
Ne
w
T
R
.
.
Содержание YZ125X 2022
Страница 5: ...EAM20162 YAMAHA MOTOR CORPORATION U S A YZ MOTORCYCLE LIMITED WARRANTY ...
Страница 8: ......
Страница 10: ......
Страница 38: ...MOTORCYCLE CARE AND STORAGE 1 26 ...
Страница 54: ...CABLE ROUTING DIAGRAM 2 15 EAM20152 CABLE ROUTING DIAGRAM Frame and engine left side view ...
Страница 56: ...CABLE ROUTING DIAGRAM 2 17 Frame and engine right side view ...
Страница 58: ...CABLE ROUTING DIAGRAM 2 19 Handlebar front view 0 in 0 mm 0 mm 0 in ...
Страница 60: ...CABLE ROUTING DIAGRAM 2 21 Rear brake right side view ...
Страница 62: ...CABLE ROUTING DIAGRAM 2 23 ...
Страница 90: ...ELECTRICAL SYSTEM 3 26 ...
Страница 158: ...CHAIN DRIVE 4 66 ...
Страница 202: ...CRANKSHAFT 5 42 seal lip 4 1 2 3 M ...
Страница 226: ...CARBURETOR 7 11 ...
Страница 230: ...ELECTRICAL COMPONENTS 8 3 EAM20147 ELECTRICAL COMPONENTS 1 2 3 1 Engine stop switch 2 CDI unit 3 Ignition coil ...
Страница 231: ...ELECTRICAL COMPONENTS 8 4 EAM30289 CHECKING THE SWITCHES 1 1 Engine stop switch ...
Страница 236: ...ELECTRICAL COMPONENTS 8 9 ...
Страница 250: ...TROUBLESHOOTING 9 13 ...
Страница 268: ......