6-4
ELEC
IGNITION SYSTEM
EC626003
IGNITION COIL INSPECTION
1. Inspect:
9
Primary coil resistance
Out of specification
→
Replace.
2. Inspect:
9
Secondary coil resistance
Out of specification
→
Replace.
NOTE:
9
Remove the spark plug cap by turning it coun-
terclockwise and inspect.
9
Install the spark plug cap by turning it clock-
wise until it is tight.
Tester (+) lead
→
Yellow lead
1
Tester (–) lead
→
Black lead
2
Tester (+) lead
→
Spark plug lead
1
Tester (–) lead
→
Yellow lead
2
Primary coil
Tester selector
resistance
position
0.24~0.36
Ω
at
Ω ×
1
20°C (68°F)
Secondary coil
Tester selector
resistance
position
5.7~8.5k
Ω
at
k
Ω ×
1
20°C (68°F)
1C3-9-31-6 4/21/05 3:31 PM Page 10
Содержание YZ125(V)
Страница 570: ...TUN MEMO...