
1-15
GEN
INFO
STARTING AND BREAK-IN
c
C
9
After the break-in or before each race, you
must check the entire machine for loose fit-
tings and fasteners as per “TORQUE-
CHECK POINTS”.
Tighten all such fasteners as required.
9
When any of the following parts have been
replaced, they must be broken in.
CYLINDER AND CRANKSHAFT:
About one hour of break-in operation is
necessary.
PISTON, RING AND GEARS:
These parts require about 30 minutes of
break-in operation at half-throttle or less.
Observe the condition of the engine careful-
ly during operation.
1C3-9-30-1B 14/5/04 5:03 PM Page 8
Содержание YZ125(T)/T1
Страница 128: ...3 3 INSP ADJ MEMO...
Страница 564: ...TUN MEMO...
Страница 565: ...TUN MEMO...
Страница 566: ...TUN MEMO...
Страница 567: ......