2-16
CABLE ROUTING DIAGRAM
1.
High tension cord
2.
Engine stop switch lead
3.
Ignition coil lead
4.
Clamp
5.
CDI unit
6.
CDI unit band
7.
Joint connector
8.
Radiator breather hose
9.
CDI magneto lead
10. Connector cover
11. Throttle cable
12. Clutch cable
13. CDI unit stay
A.
Pass the high tension cord to the
left of the radiator hose.
B.
Using a plastic locking tie, clamp
the engine stop switch lead, igni-
tion coil lead and CDI magneto
lead together with the clamp
ends backward and then cut off
the tie end.
C.
Clamp to the frame the throttle
cable, clutch cable, ignition coil
lead and engine stop switch
lead. In so doing, clamp the igni-
tion coil lead and engine stop
switch lead at their protecting
tubes. Tighten the clamp so that
the engine stop switch lead is
not pulled when the handlebar is
turned to the right and left.
Содержание YZ125 2016
Страница 4: ......
Страница 12: ...1 2 LOCATION OF IMPORTANT LABELS EUROPE...
Страница 13: ...1 3 LOCATION OF IMPORTANT LABELS AUS NZ ZA...
Страница 61: ...3 18 CHASSIS...
Страница 149: ...5 40 REAR SHOCK ABSORBER 7 Tighten Bolt air filter joint 1 Bolt air filter joint 2 Nm 0 2 m kg 1 4 ft lb...
Страница 165: ......
Страница 166: ...PRINTED IN JAPAN E PRINTED ON RECYCLED PAPER...