ENGINE
3-7
4. Install:
• Vacuum gauge “1”
• Digital tachometer
5. Install:
• Fuel tank
Refer to “FUEL TANK” on page 7-1.
6. Adjust:
• Throttle body synchronization
▼▼▼
▼
▼ ▼▼▼
▼
▼ ▼▼▼
▼
▼ ▼▼▼
▼
▼ ▼▼▼
▼
▼ ▼▼▼
▼
▼▼▼
a. Measure the vacuum pressure of the front
cylinder throttle body and rear cylinder throt-
tle body.
b. Using the throttle body with the lowest vacu-
um pressure as the standard, turn the air
screw “1” of the other throttle body to adjust
its vacuum pressure.
c. If the vacuum pressure of the throttle body
with the lower pressure is out of specification,
adjust it to specification first, and then syn-
chronize the throttle bodies.
NOTE:
• After each step, rev the engine two or three
times, each time for less than a second, and
check the synchronization again.
• If the air screw is removed, turn the screw 3/4
turn in and be sure to synchronize the throttle
body.
CAUTION:
ECA14900
Do not use the throttle valve adjusting
screws to adjust the throttle body synchroni-
zation.
Vacuum gauge
90890-03094
Carburetor synchronizer
YU-44456
1
A. Front cylinder throttle body
B. Rear cylinder throttle body
Vacuum gauge
90890-03094
Carburetor synchronizer
YU-44456
1
A
1
B
1
1
A
B
Содержание XVS13AW
Страница 2: ...SERVICE MANUAL XVS13AW C XVS13CTW C LIT 11616 20 42 3D8 28197 10 ...
Страница 7: ......
Страница 9: ......
Страница 25: ...SPECIAL TOOLS 1 15 ...
Страница 52: ...LUBRICATION POINTS AND LUBRICANT TYPES 2 26 ...
Страница 55: ...LUBRICATION SYSTEM CHART AND DIAGRAMS 2 29 EAS20410 LUBRICATION DIAGRAMS A A 1 2 2 3 A A ...
Страница 57: ...LUBRICATION SYSTEM CHART AND DIAGRAMS 2 31 1 2 3 ...
Страница 58: ...LUBRICATION SYSTEM CHART AND DIAGRAMS 2 32 1 Camshaft 2 Oil nozzle 3 Crankshaft ...
Страница 59: ...LUBRICATION SYSTEM CHART AND DIAGRAMS 2 33 1 2 ...
Страница 60: ...LUBRICATION SYSTEM CHART AND DIAGRAMS 2 34 1 Oil delivery pipe 1 2 Timing chain tensioner ...
Страница 61: ...LUBRICATION SYSTEM CHART AND DIAGRAMS 2 35 1 2 3 4 5 6 ...
Страница 63: ...COOLING SYSTEM DIAGRAMS 2 37 EAS20420 COOLING SYSTEM DIAGRAMS A A A A 2 1 4 3 5 6 ...
Страница 65: ...COOLING SYSTEM DIAGRAMS 2 39 A B B A 4 3 3 1 2 2 A A B B ...
Страница 67: ...COOLING SYSTEM DIAGRAMS 2 41 10 13 4 7 3 1 10 9 6 B C A 12 11 C B A 1 8 9 10 10 12 3 2 4 5 6 7 ...
Страница 75: ...CABLE ROUTING 2 49 C D D C C A A F E B A C B D E F F G 1 2 3 4 4 4 5 6 6 6 6 7 8 F A A D D C B E ...
Страница 83: ...CABLE ROUTING 2 57 3D8 3D8 A B B A A B C D E 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 ...
Страница 85: ...CABLE ROUTING 2 59 ...
Страница 89: ...CABLE ROUTING 2 63 ...
Страница 92: ......
Страница 125: ...ELECTRICAL SYSTEM 3 33 ...
Страница 128: ......
Страница 203: ...BELT DRIVE 4 75 ...
Страница 262: ...CLUTCH 5 56 9 Adjust Clutch lever free play Refer to ADJUSTING THE CLUTCH LEVER FREE PLAY on page 3 13 2 1 c b a ...
Страница 305: ...WATER PUMP 6 11 ...
Страница 319: ...THROTTLE BODIES 7 13 ...
Страница 322: ......
Страница 328: ...IGNITION SYSTEM 8 6 ...
Страница 336: ...CHARGING SYSTEM 8 14 1 AC magneto 2 Rectifier regulator 3 Main fuse 6 Battery ...
Страница 338: ...CHARGING SYSTEM 8 16 ...
Страница 352: ...COOLING SYSTEM 8 30 ...
Страница 389: ...ELECTRICAL COMPONENTS 8 67 EAS27970 ELECTRICAL COMPONENTS 1 4 5 6 7 8 9 10 11 12 13 2 3 ...
Страница 391: ...ELECTRICAL COMPONENTS 8 69 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 ...
Страница 413: ...ELECTRICAL COMPONENTS 8 91 ...
Страница 421: ......
Страница 422: ...YAMAHA MOTOR CO LTD 2500 SHINGAI IWATA SHIZUOKA JAPAN ...