
NOTE:
When a new seal is installed, grease
the lips of the seal before installation. Inspect
the seal after installation.
C. Crankshaft and Crankcases
1. Install crankshaft into bottom crankcase.
Crankcase bearings must be well oiled.
2. Apply Yamabond No. 4 sealant to crankcase
mating surfaces.
I
CAUTION: DO not
allow sealant t o contact
bearing inserts.
3.
Make sure the o-ring is installed. Make sure all
shafts and seals are positioned properly.
4. Install crankcase top and bolts. Install bolts
as follows:
a.
Use copper washers on bolts
5,
6,
7,
8.
b. Bolt threads must be oiled.
c. Tighten bolts in two
stages
in proper torque
sequence. Start with bolt number one. Tighten
the unnumbered bolt as number 24.
Stage 1:
8mm
bolts 1 . 0 m - k g
(7
ft-lb)
2.0 m-kg (14 ft-lb)
Stage 2:
8mm
bolts
2.0 m-kg (14 ft-lb)
10mm bolts
3.7 m-kg (27 ft-lb)
10mm bolts
D. Oil Pump
1. Reassemble
oil
pump in reverse disassembly
order. Lubricate the oil pump well during
assembIy
.
2. Install
oil pump. Make sure rotor housing seal
is positioned correctly.
NOTE:
The oil pump must be full of oil when
installed.
3. Install strainer cover. Use a new gasket.
I
Strainer cover torque:
1.0
m-kg (7 ft-lb)
I
E. Shifter Assembly
1. Install shift shaft. Install circlip (E-clip) on
left side of crankcases.
Содержание XS750
Страница 1: ......
Страница 10: ...Componentsshould be room temperature 500 600 ...
Страница 12: ......
Страница 20: ...Intake i I CLEARANCE Exhaust ...
Страница 93: ...XS750 Power Flow Schematic ...
Страница 133: ......
Страница 134: ......
Страница 136: ......
Страница 138: ...OIL SCAVENGE Return ...
Страница 142: ......
Страница 154: ......