2-26
SPEC
CABLE ROUTING
B
B C
C
A - A
B - B
C - C
D
view D
1.5 ~ 3 mm
30¡
2 ~ 3 mm
A
A
A
B
Right handlebar switches
Inner handlebar cover
Left handlebar switches
Rear brake lever
Front handlebar cover
Master cylinder
Front brake lever
A
Glue the handlebar grip.
B
Install the handlebar switch as shown.
Содержание XN125 2000
Страница 1: ...XN125 2000 XN150 5MF1 AE2 SERVICE MANUAL ...
Страница 7: ...1 GEN INFO ...
Страница 18: ...2 SPEC ...
Страница 47: ...3 CHK ADJ ...
Страница 94: ...4 ENG ...
Страница 146: ...5 COOL ...
Страница 156: ...6 CARB ...
Страница 165: ...7 CHAS ...
Страница 206: ...8 ELEC ...
Страница 250: ...9 TRBL SHTG ...