Pre-operation checks
66
Securely install the stern drain plugs by tight-
ening them until they stop.
EJU43810
Hood check
Push down the hood latch and make sure
that it is securely closed.
EJU40146
Post-launch checks
Perform the post-launch checks in the pre-
operation checklist while the watercraft is in
the water and the engine is running.
To perform the post-launch checks:
(1) Launch the watercraft. (See page 69 for
information on launching the watercraft.)
(2) Perform the checks and make sure that
there are no malfunctioning items or oth-
er problems.
EJU40553
Cooling water pilot outlet check
Make sure that water is discharged from the
cooling water pilot outlet while the engine is
running. (See page 29 for information on the
cooling water pilot outlet.)
EJU32715
Multifunction information center check
Make sure that the multifunction information
center operates properly. (See page 38 for in-
formation on proper operation of the multi-
function information center.)
EJU43392
Shift system check
Operate the throttle lever and RiDE lever, and
check that the watercraft moves or does not
move according to the displayed shift indica-
tor. (See page 31 for shift system operation
procedures.)
WARNING! To avoid colli-
sions, operate at safe speeds and keep a
1
Stern drain plug
1
UF4E74E0.book Page 66 Wednesday, July 17, 2019 4:26 PM