Pre-operation checks
65
EJU41440
Hood check
Push down on the rear of the hood and make
sure that it is securely closed.
EJU40144
Post-launch checks
Perform the post-launch checks in the pre-op-
eration checklist while the watercraft is in the
water and the engine is running.
To perform the post-launch checks:
(1) Launch the watercraft. (See page 67 for
information on launching the watercraft.)
(2) Perform the checks and make sure that
there are no malfunctioning items or oth-
er problems.
EJU40552
Cooling water pilot outlet check
Make sure that water is discharged from the
cooling water pilot outlet while the engine is
running. (See page 35 for information on the
cooling water pilot outlet.)
EJU32713
Multifunction information center check
Make sure that the multifunction information
center operates properly. (See page 40 for in-
formation on proper operation of the multi-
function information center.)
EJU40171
Engine idling speed check
Start the engine and warm it up. Use the ta-
chometer in the multifunction information cen-
ter to make sure that the engine idling speed
is not significantly above or below the speci-
fied range.
Engine idling speed:
1300
±
100 r/min
UF2M10E0.book Page 65 Wednesday, July 14, 2010 5:02 PM
Содержание VXS: VXR
Страница 12: ...General and important labels 7 UF2M10E0 book Page 7 Wednesday July 14 2010 5 02 PM ...
Страница 13: ...General and important labels 8 EJU35925 Other labels UF2M10E0 book Page 8 Wednesday July 14 2010 5 02 PM ...
Страница 107: ...UF2M10E0 book Page 3 Wednesday July 14 2010 5 02 PM ...
Страница 108: ...Printed in USA July 2010 0 2 1 CR YAMAHA MOTOR CORPORATION USA DIC183 ...