4-3
1
2
3
4
5
6
7
8
9
PRE-OPERATION CHECKS
Centerstand
• Make sure that operation is smooth.
• Lubricate pivot if necessary.
6-18
Chassis fasteners
• Make sure that all nuts, bolts and screws are properly tightened.
• Tighten if necessary.
-
Instruments, lights, signals
and switches
• Check operation.
• Correct if necessary.
3-3
Engine stop switch
• Check operation.
3-4
ITEM
CHECKS
PAGE
3D1-F8199-71ch4SGML.pmd
2006/05/15, 19:24
3
Содержание VINO XC50V
Страница 2: ...1 2 3 4 5 6 7 8 9 EAU10041 3D1 F8199 11ch0SGML pmd 2006 05 15 19 02 1 ...
Страница 13: ...1 6 1 2 3 4 5 6 7 8 9 Q Q Q Q Q SAFETY INFORMATION 1 2 3 4 5 6 3D1 F8199 11ch1SGML pmd 2006 05 15 19 03 6 ...
Страница 74: ...9 8 1 2 3 4 5 6 7 8 9 CONSUMER INFORMATION 3D1 F8199 11ch9SGML pmd 2006 08 17 11 29 8 ...
Страница 79: ...1 2 3 4 5 6 7 8 9 3D1 F8199 11ch0SGML pmd 2006 05 15 19 02 7 ...