INSTRUMENT AND CONTROL FUNCTIONS
3-7
3
2. Press the “SET/DEC” (set/decel-
erate) side of the cruise control
switch to activate the cruise con-
trol system. The “SET” indicator
light comes on.
3. Set the desired traveling speed as
follows. Press the “RES/ACC” (re-
sume/accelerate) side of the
cruise control switch to increase
the set speed or the “SET/DEC”
side to decrease the speed.
NOTE:
_
Pressing the cruise control switch once
will change the speed in increments of
1.6 km/h. Holding the cruise control
switch down will increase or decrease
the speed continuously until the switch
is released.
_
The traveling speed can be set to a
maximum of 130 km/h and a minimum
of 50 km/h.
When the cruise control system is acti-
vated and the throttle grip is turned to
increase the speed by up to 8 km/h, the
cruise control system will return to the
set speed after the throttle grip is re-
leased. However, if the speed is in-
creased by more than 8 km/h, the
cruise control system will be deactivat-
ed until the traveling speed is within
8 km/h of the set speed.
Deactivating the cruise control
system
Applying the front or rear brake or dis-
engaging the clutch will automatically
deactivate the cruise control system.
Push the “CANCEL” switch to manually
deactivate cruise control.
NOTE:
_
●
When the cruise control system is
deactivated, the “RES” (resume)
indicator light will come on.
●
Traveling speed decreases as
soon as the cruise control system
is deactivated; unless the throttle
grip is turned.
_
1. Cruise control switch
2. “CANCEL” switch
1. “SET” indicator light
2. “RES” indicator light
3. “ON” indicator light
E_5jc.book Page 7 Monday, January 22, 2001 12:12 PM
Содержание Venture XVZ1300TF
Страница 1: ...XVZ1300TF OWNER S MANUAL ...
Страница 2: ...F_5eb_Toc0 fm Page 2 Wednesday February 2 2000 2 02 PM ...
Страница 8: ...E_5jc book Page 2 Monday January 22 2001 12 12 PM ...
Страница 40: ...E_5jc book Page 25 Monday January 22 2001 12 12 PM ...
Страница 60: ...E_5jc book Page 19 Monday January 22 2001 12 12 PM ...
Страница 61: ...PRE OPERATION CHECKS 5 Pre operation check list 5 1 E_5jc book Page 1 Monday January 22 2001 12 12 PM ...
Страница 72: ...E_5jc book Page 7 Monday January 22 2001 12 12 PM ...
Страница 113: ...MOTORCYCLE CARE AND STORAGE 8 Care 8 1 Storage 8 4 E_5jc book Page 1 Monday January 22 2001 12 12 PM ...
Страница 119: ...SPECIFICATIONS 9 Specifications 9 1 Conversion table 9 5 E_5jc book Page 1 Monday January 22 2001 12 12 PM ...
Страница 130: ...F_5eb_Toc0 fm Page 2 Wednesday February 2 2000 2 02 PM ...
Страница 131: ...F_5eb_Toc0 fm Page 2 Wednesday February 2 2000 2 02 PM ...
Страница 132: ......