Periodic maintenance
67
8.
Connect the negative battery lead.
9.
Install the air filter case by reversing the
removal steps.
CAUTION:
ECS00640
Be sure to connect the breather hoses se-
curely when installing the air filter case.
10. Connect the headlight couplers and
speedometer coupler, and then install the
headlight unit, making sure to insert the
projections on the headlight unit stay into
the slots on the bottom of the headlight
unit.
11. Install the headlight unit bolts, and then
tighten them to the specified torque.
12. Install the top cover, the right side cover,
the left side cover, and the shroud.
NOTE:
If the fuse immediately blows again, ask a
Yamaha dealer to inspect the snowmobile.
Headlight unit bolt tightening torque:
3 Nm (0.3 m·kgf, 2.2 ft·lb)
U8GM10E0.book Page 67 Friday, April 27, 2007 6:43 PM
Содержание Vector RS90RX
Страница 1: ...OWNER S MANUAL RS90RX RS90GTX RS90GTAX RS90LTX RS90LTGTX 8GM 28199 10 LIT 12628 02 70 ...
Страница 2: ...ESU10040 U8GM10E0 book Page 1 Friday April 27 2007 6 43 PM ...
Страница 11: ...Safety information 5 U8GM10E0 book Page 5 Friday April 27 2007 6 43 PM ...
Страница 89: ...U8GM10E0 book Page 3 Friday April 27 2007 6 43 PM ...
Страница 90: ...YAMAHA MOTOR CO LTD PRINTED ON RECYCLED PAPER PRINTED IN JAPAN 2007 05 0 6 1 CR ...