ENG
ASSEMBLING AND ADJUSTING THE ENGINE
4-41
2.
Install:
• Drive chain
NOTE:
After installing the drive chain adjust the ten-
sion of the chain. See “ADJUSTING CHAIN” in
Chapter 6.
3.
Install:
• Crankcase cover 2 (left)
• Output gear cover
• Shift cam
4.
Install:
• Oil pump cover
• Spark plug
• Exhaust pipe
• Springs
• AIS pipe
5.
Add:
• Transmission oil
• Coolant
Screws for securing crankcase
cover 2
0.5 m • kg
Screws for securing output gear
cover
0.5 m • kg
Shift cam screw.
0.6 m • kg
Pump cover securing screw:
0.4 m • kg
Spark plug:
2.0 m • kg
Screws for securing the exhaust
pipe to the chassis:
2.1 m • kg
3.0 m • kg
Transmission oil:
total: 0.82 L
Total amount of coolant:
0.7 L
Screw for the clamp of the AIS
tube:
0. 4 m • kg
Содержание TZR50 '03
Страница 1: ...SERVICE MANUAL TZR50 X POWER 03 5WX AE1 03 ...
Страница 7: ...GEN INFO 1 ...
Страница 17: ......
Страница 18: ...SPEC 2 ...
Страница 38: ......
Страница 39: ...INSP ADJ 3 ...
Страница 78: ...ENG 4 ...
Страница 108: ...ENG ASSEMBLING AND ADJUSTING THE ENGINE 4 29 STARTER MOTOR Starter motor Screw Magnetic flywheel Screw Nut ...
Страница 122: ......
Страница 123: ...COOL 5 ...
Страница 136: ...CARB 6 ...
Страница 144: ......
Страница 145: ...CHAS 7 ...
Страница 197: ......
Страница 198: ...ELEC 8 ...
Страница 200: ......
Страница 201: ...ELEC ELECTRICAL DIAGRAM 8 2 ELECTRICAL DIAGRAM ...
Страница 211: ...ELEC CHARGING SYSTEM 8 12 CHARGING SYSTEM CIRCUIT DIAGRAM ...
Страница 216: ......
Страница 217: ...ELEC LIGHTING SYSTEM 8 18 LIGHTING SYSTEM CIRCUIT DIAGRAM ...
Страница 227: ...ELEC SIGNALING SYSTEM 8 28 SIGNALING SYSTEM CIRCUIT DIAGRAM ...
Страница 244: ......
Страница 245: ...ELEC COOLING SYSTEM 8 46 COOLING SYSTEM CIRCUIT DIAGRAM ...
Страница 250: ......