4 - 48
ENG
CLUTCH AND PRIMARY DRIVEN GEAR
9. Adjust:
●
Push lever position
Adjustment steps:
●
Loosen the locknut
1
.
●
Turn the push rod 1
2
clockwise or coun-
terclockwise to match alignment marks.
●
Hold the push rod 1 to prevent it from
moving and tighten the locknut to specifi-
cation.
●
Tighten the locknut
1
.
T
R
.
.
Locknut:
8 Nm (0.8 m • kg, 5.8 ft • lb)
10. Install:
●
Dowel pins
●
Gasket (right crankcase cover)
●
Right crankcase cover
●
Bolts (right crankcase cover)
NOTE:
●
Apply Quick gasket
®
(Yamaha bond No.
1215) to end of the right crankcase cover
bolts, as shown.
●
Tighten the bolts in stages, using a criss-
cross pattern.
Quick gasket
®
:
ACC-QUICK-GS-KT
Yamaha bond No. 1215:
90890-85505
New
T
R
.
.
10 Nm (1.0 m · kg, 7.2 ft · lb)
11. Install:
●
Kickstarter crank
1
●
Nut (kickstarter crank)
2
NOTE:
Install the kickstarter crank so that there is 5 ~
10 mm (0.2 ~ 0.4 in)
a
between the kickstarter
crank and the right crankcase cover.
T
R
.
.
50 Nm (5.0 m · kg, 36 ft · lb)
Содержание TTR125LM
Страница 22: ...INDEX GENERAL INFORMATION SPECIFICATIONS REGULAR INSPECTION AND ADJUSTMENT ENGINE CHASSIS ELECTRICAL...
Страница 47: ...GEN INFO MEMO...
Страница 63: ...GEN INFO MEMO...
Страница 78: ...SPEC 2 11 MAINTENANCE SPECIFICATIONS Cylinder head tightening sequence...
Страница 95: ...SPEC 2 11 CARACT RISTIQUES D ENTRETIEN Ordre de serrage de la culasse...
Страница 112: ...SPEC 2 11 WARTUNGSDATEN Anzugsreihenfolge Zylinderkopfschrauben...
Страница 119: ...SPEC MEMO...
Страница 135: ...INSP ADJ MEMO...
Страница 230: ...4 23 ENG CAMSHAFT AND ROCKER ARMS 5 Install Camshaft bearing holder 1 Bolt 2 T R 10 Nm 1 0 m kg 7 2 ft lb LT...
Страница 461: ...ELEC MEMO...
Страница 468: ...PRINTED IN JAPAN 00 1 2 1 1 CR PRINTED ON RECYCLED PAPER YAMAHA MOTOR CO LTD 2500 SHINGAI IWATA SHIZUOKA JAPAN...