2
Product Overview
2-5 Installing the robot
2-5
n
NOTE
Positions of robot mounting holes differ according to the stroke length of
each robot. Refer to the dimensional outlines shown in Chapter 4 "4-1 Main
unit specifi cations".
2-5 Installing the robot
w
WARNING
• BEFORE INSTALLING THE ROBOT, ALWAYS MAKE SURE THAT THE ROBOT
CONTROLLER IS NOT CONNECTED TO THE ROBOT OR THE POWER TO THE
CONTROLLER IS OFF. SERIOUS ACCIDENTS MAY OCCUR IF THE ROBOT
STARTS TO OPERATE DURING INSTALLATION.
• BE SURE TO USE THE BOLTS OF THE SPECIFIED SIZE AND LENGTH AND TIGHTEN
THEM SECURELY TO THE CORRECT TORQUE IN THE CORRECT POSITIONS.
FAILURE TO FOLLOW THIS INSTRUCTION MAY CAUSE ROBOT VIBRATIONS,
POSITION ERRORS AND SERIOUS ACCIDENTS.
DO NOT USE A BOLT LONGER THAN THE SPECIFIED LENGTH SINCE IT MAY
INTERFERE WITH THE INTERNAL PARTS OF THE ROBOT AND CAUSE
MALFUNCTIONS.
Drill holes into the surface of the installation base as shown in the figure below, and
secure the robot with the prescribed bolts which are inserted from the installation base's
bottom face. The bolts and tightening torques are shown below.
• SSC04
Robot
Bolt
Tightening torque
SSC04
Hex socket-head M5 bolt, Strength: 8.8T
Length: Installation base width + 8mm
or less
60kgf•cm to 90kgf•cm
M5 bolt
Содержание TRANSERVO SSC04
Страница 2: ......
Страница 4: ...MEMO ...
Страница 8: ......
Страница 24: ...1 16 MEMO ...
Страница 26: ......
Страница 40: ...MEMO 2 14 ...
Страница 42: ......
Страница 62: ......
Страница 76: ...4 14 MEMO ...
Страница 77: ...Chapter 5 Troubleshooting Contents 5 1 Positioning error 5 1 ...
Страница 78: ......